Linden, NJ Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing chapter
- Linden City Code § 26-17, Stormwater Control
- Applies to
- "Major development": nonresidential, some residential
- TSS removal trigger
- 80% removal when adding 1/4 acre+ vehicle surface
- Groundwater recharge
- Maintain 100% of pre-construction recharge volume
- Last amended
- Ord. No. 68-41, adopted 8-20-2024
- Deed notice
- Approved BMPs recorded with the County Clerk
Summary
Linden regulates stormwater runoff from "major development" under City Code § 26-17, requiring green infrastructure and other best management practices for nonresidential projects and non-preempted residential work. New development that adds a quarter acre or more of vehicle surface must remove 80% of total suspended solids, and site engineers must generally preserve the property's full pre-construction groundwater recharge volume.
The purpose of this section is to establish minimum stormwater management requirements and controls for "major development," as defined below in Section 26-17.2. ... c. Applicability. 1. This section shall be applicable to the following major developments: (a) Non-residential major developments; and (b) Aspects of residential major developments that are not pre-empted by the Residential Site Improvement Standards at N.J.A.C. 5:21. ... Stormwater runoff quality standards are applicable when the major development results in an increase of one-quarter acre or more of regulated motor vehicle surface. ... Eighty percent TSS removal of the anticipated load, expressed as an annual average shall be achieved for the stormwater runoff from the net increase of motor vehicle surface. ... Demonstrate through hydrologic and hydraulic analysis that the site and its stormwater management measures maintain 100% of the average annual pre-construction groundwater recharge volume for the site.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4586096; v16 updated 2025-12-16; through 12-16-2025).
Full Breakdown
Chapter 26-17, Stormwater Control, was amended in entirety by Ord. No. 65-17 (2021) and again by Ord. No. 68-41 (2024). C. 5:21), and to any major development the City of Linden itself undertakes. Design engineers must use green infrastructure best management practices, such as dry wells, small-scale bioretention systems, pervious pavement, and vegetative filter strips, to meet three separate standards. 25 inches of rain falling over two hours. For groundwater recharge, the engineer must demonstrate through hydrologic and hydraulic analysis that the site keeps 100% of its average annual pre-construction recharge volume, or that the increased two-year storm runoff volume is fully infiltrated, unless the project sits in the City's designated urban redevelopment area.
Recharge is barred outright from "high pollutant loading areas," including spots where solvents, petroleum products, or pesticides are loaded, unloaded, or stored, and from industrial stormwater exposed to raw materials, byproducts, fuels, or solvents, a carve-out with obvious relevance in a refinery city like Linden. Every approved stormwater measure must be described in a deed notice recorded with the County Clerk, identifying its location and referencing the required maintenance plan, before construction can begin.
Violations & Fines
Violations of Chapter 26-17 are enforced under Linden's general municipal penalty ordinance, City Code § 1-5, which § 26-17.11 cross-references for any person who erects, alters, or uses a building, structure, or land in violation of the stormwater rules. The Municipal Court can also require correction of noncompliant best management practices and confirm the required deed notice was recorded with the County Clerk before construction proceeds.
Frequently Asked Questions
Does Linden require a stormwater plan for a small residential addition?
What water quality standard applies to a new industrial building near the refinery corridor?
Can stormwater be recharged into groundwater on an industrial site in Linden?
Does an approved stormwater measure need to be recorded anywhere?
Sources & Official References
Other rules in Linden
Compare Linden to another location·View the New Jersey environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Stormwater Management in Nearby Cities
How other cities in Union County handle stormwater management.