Baltimore County, MD Environmental Rules: Stormwater Management (2026)
Key Facts
- Exempt disturbance threshold
- 5,000 sq ft or less
- Redevelopment impervious cut
- At least 50% reduction
- Permit validity
- 2 years, 1-year extension
- Criminal fine
- Up to $1,000 per violation
- Civil penalty option
- Up to $5,000 plus injunction
- Enforcing agency
- Dept. of Environmental Protection and Sustainability
- Governing law
- County Code § 33-4-102, § 33-4-104
Summary
Baltimore County bars developing or redeveloping any site without stormwater management measures that control runoff, using environmental site design to the maximum extent practicable before any structural pond or filter is built. The Department of Environmental Protection and Sustainability enforces the requirement under County Code Article 33, Title 4, with the Department of Public Works and Transportation assisting.
Except as provided in this title, a person may not develop or redevelop any site without providing for appropriate stormwater management measures that control or manage stormwater runoff from the site. The stormwater management measures shall be:(i)Consistent with the Design Manual; and(ii)Constructed in accordance with a plan approved by the Department. ... Criminal. A person who violates any provision of this title is guilty of a misdemeanor and on conviction is subject to a fine not exceeding $1,000 for each violation. ... Civil.(1)As an alternative to a criminal action, the county may bring a civil action against any person for any violation of this title.(2)The action may seek the imposition of a civil penalty of not more than $5,000 against the person, an injunction to prohibit the person from continuing the violation, or both.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 29 | Zoning Regulations: Supplement 10).
Full Breakdown
Section 33-4-102 sets the purpose of Article 33, Title 4: managing stormwater through environmental site design (ESD) "to the maximum extent practicable," using structural best management practices only when ESD cannot do the job, in order to reduce local flooding, stream channel erosion, and property damage. Section 33-4-104(a) makes the rule concrete: a person may not develop or redevelop a site without stormwater management measures that are consistent with the county's Design Manual and built under a plan the Department of Environmental Protection and Sustainability has approved.
Small projects get relief: developments that disturb 5,000 square feet or less of land, agricultural land management, and minor additions to existing single-family homes are exempt under Section 33-4-104(b), but the Director must certify any claimed exemption in writing. Everything else goes through three plan stages under Section 33-4-107, concept, development, and final, each adding detail on drainage areas, impervious area, and required storage volumes for recharge, water quality, channel protection, and overbank flood control. A stormwater management permit under Section 33-4-108 cannot issue until security is posted, an environmental agreement is executed, and the Soil Conservation District has approved the erosion and sediment control plan; permits expire two years after issuance, with one-year extensions available on written request.
Redevelopment sites carry their own math: Section 33-4-105 requires cutting existing impervious area within the limit of disturbance by at least 50%, or treating an equivalent share with ESD, unless the applicant pays into the county's Stormwater Management Fund.
Violations & Fines
Section 33-4-115 makes any violation of the stormwater title a misdemeanor carrying a fine of up to $1,000 per violation, with each day of continued noncompliance charged as a separate offense. The county can instead bring a civil action seeking a penalty of up to $5,000 plus an injunction ordering the violation stopped. The Department of Environmental Protection and Sustainability enforces through Article 3, Title 6 code enforcement procedures, including correction notices and stop-work orders.
Frequently Asked Questions
Does every construction project in Baltimore County need a stormwater permit?
How long does a Baltimore County stormwater permit last?
What is the penalty for skipping stormwater management approval?
Sources & Official References
Other rules in Baltimore County
Compare Baltimore County to another location·View the Maryland environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.