Paterson, NJ Environmental Rules: Stormwater Management (2026)
Key Facts
- Applies to
- Major development projects
- Goal
- Flood control & groundwater recharge
- Last amended
- April 15, 2025
- Max fine
- $1,250
Summary
Paterson requires green infrastructure and stormwater management measures for non-residential and larger residential major development projects, aimed at flood control, groundwater recharge and pollutant reduction.
Flood control, groundwater recharge, and pollutant reduction shall be achieved through the use of stormwater management measures, including green infrastructure Best Management Practices (GI BMPs) and nonstructural stormwater management strategies. GI BMPs and low impact development (LID) should be utilized to meet the goal of maintaining natural hydrology to reduce stormwater runoff volume, reduce erosion, encourage infiltration and groundwater recharge, and reduce pollution. GI BMPs and LID should be developed based upon physical site conditions and the origin, nature and the anticipated quantity, or amount, of potential pollutants. Multiple stormwater management BMPs may be necessary to achieve the established performance standards for water quality, quantity, and groundwater recharge.
B. Purpose. It is the purpose of this chapter to establish minimum stormwater management requirements and controls for major development, as defined in § 433-2.
C. Applicability.
(1) This chapter shall be applicable to the following major developments:
(a) Non-residential major developments; and
(b) Aspects of residential major developments that are not pre-empted by the Residential Site Improvement Standards at N.J.A.C. 5:21.
(2) This chapter shall also be applicable to all major developments undertaken by the City of Paterson.
(3)
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4713536; v19 updated 2025-12-16; through 12-16-2025).
Full Breakdown
Chapter 433 of the Paterson City Code sets minimum stormwater management requirements for 'major development' as defined in § 433-2: essentially larger site disturbances and impervious-coverage increases. The chapter, most recently amended April 15, 2025, requires green infrastructure best-management practices and nonstructural strategies to control flooding, protect groundwater recharge, and reduce pollutants, and applies to all non-residential major development plus the parts of residential major development not preempted by the state's Residential Site Improvement Standards. It doesn't reach ordinary landscaping or drainage on existing single-family lots outside a major development project.
Violations & Fines
Noncompliant stormwater work is punishable under § 433-12 by a fine up to $1,250; § 433-11 separately bars repaving over a storm drain inlet that fails retrofit standards and requires dumpsters to stay covered and leak-free.
Frequently Asked Questions
Does Paterson's stormwater chapter apply to my house?
What's the penalty for violating the stormwater ordinance?
Sources & Official References
Other rules in Paterson
Compare Paterson to another location·View the New Jersey environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.