Skip to main content
CityRuleLookup

Pitt County, NC Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Adopted / effective
June 3, 2024 / July 1, 2024
Riparian buffer width
50 feet from streams, ponds, lakes
Residential exemption threshold
Disturbs less than 1 acre
Small commercial exemption
Disturbs less than 1/2 acre
Built-upon area cap for expansions
24% of parcel
Enforcing office
Pitt County Stormwater Administrator

Summary

Pitt County regulates post-development stormwater runoff countywide under the Stormwater Management Ordinance for Nutrient Control, adopted June 3, 2024 and effective July 1, 2024. A stormwater permit from the Stormwater Administrator is required for most new development and redevelopment in the Neuse and Tar-Pamlico watersheds, with narrow acreage-based exemptions for small residential projects.

These county ordinances apply to unincorporated areas of Pitt County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Beginning with and subsequent to its effective date, this ordinance shall be applicable to all development and expansion of development throughout the planning jurisdiction of Pitt County, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to this ordinance.

(A) Exemptions The following are exempt from this ordinance:

(1) Single family and duplex residential and related recreational development and expansion of development that disturbs less than one acre;

(2) Commercial, industrial, institutional, multifamily residential or local government development that disturbs less than one half acre and does not expand existing structures on a parcel;

(3) ...and expands existing structures on a parcel but does not result in a cumulative built-upon area for the parcel exceeding twenty-four (24) percent;

(4) Development of an individual single-family or duplex residential lot that is not part of a larger common plan of development or sale and does not result in greater than five (5) percent built-upon area on the lot;

Full Breakdown

04. 09 requires a stormwater permit for site plan, subdivision, and grading applications unless a project qualifies for one of the listed exemptions: single-family or duplex development disturbing less than one acre, commercial or institutional development disturbing less than one-half acre that does not expand existing structures, expansions under one-half acre that keep built-upon area at or below 24 percent, or an individual lot developed outside a common plan that stays at or below 5 percent built-upon area. 0714); the County must disapprove new development within that first 50 feet unless the North Carolina Department of Environmental Quality (NCDEQ) has issued an on-site determination, an authorization certificate, a vested-rights opinion, or a variance letter.

S. 21. S. 160D-404, or seek an injunction through the County Attorney for any uncorrected violation, and each day a violation continues is treated as a separate offense.

Violations & Fines

Enforcement runs through the Stormwater Administrator. Civil penalties are assessed by the Technical Review Committee up to the maximum authorized by N.C.G.S. 143-215.6A after the violator has been notified and given a compliance period; each day of continuing violation is a separate assessable violation. The County may also withhold a certificate of occupancy, deny future permits, issue a stop-work order, or pursue injunctive relief and lien-based cost recovery for violations that endanger public health under N.C.G.S. 160A-193.

Frequently Asked Questions

Does the Pitt County stormwater ordinance apply to my property inside Greenville or Winterville?
No. This county ordinance governs the unincorporated planning jurisdiction of Pitt County. Greenville, Winterville, Ayden, and Farmville each administer their own stormwater rules within their municipal limits, so check the city code if your parcel is inside one of those towns.
Do I need a stormwater permit to build a single-family home in Pitt County?
Only if the project disturbs one acre or more, or if it is part of a larger common plan of development. Section .09 exempts an individual single-family or duplex lot outside a common plan if the resulting built-upon area stays at or below 5 percent of the lot.
How wide is the required buffer next to a stream on my Pitt County property?
Section .18 requires a 50-foot riparian buffer on all sides of intermittent and perennial streams, ponds, lakes, and estuarine waters under the Tar-Pamlico and Neuse buffer rules. New development inside that 50 feet is disapproved unless NCDEQ has approved the activity.
What happens if I build without the required stormwater permit?
The Stormwater Administrator can withhold your certificate of occupancy, deny future permit requests, issue a stop-work order under N.C.G.S. 160D-404, and refer the matter for civil penalties assessed by the Technical Review Committee up to the maximum set by N.C.G.S. 143-215.6A, with each day of violation counted separately.

Sources & Official References

Other rules in Pitt County

All Pitt County rules

Compare Pitt County to another location·View the North Carolina environmental rules overview

Get notified when Stormwater Management in Pitt County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.