Houston County, GA Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing section
- County Code § 30-121
- Adopted by
- Res. of Nov. 15, 2005
- Program
- NPDES Phase II
- Incorporated documents
- Water Resources Protection Ordinance Arts. 1-4, Local Design Manual
- Applies to
- all surface waters in unincorporated Houston County
- Related sections
- § 30-101 wetlands overlay; § 30-161 groundwater recharge
Summary
Houston County regulates stormwater quality and quantity for all surface waters in the unincorporated county through its separately adopted Water Resources Protection Ordinance, incorporated into the Code at § 30-121 under the federal NPDES Phase II program. The adoption took effect by county resolution on November 15, 2005.
Pursuant the NPDES Phase II requirements, Articles 1 through 4 of the Houston County Water Resources Protection Ordinance and the Local Design Manual are hereby adopted in their entirety as the water quality and quantity policies applicable to all surface waters in unincorporated Houston County, with the like effect as if recited in this section.
Full Breakdown
Rather than printing full stormwater engineering standards inside Chapter 30 itself, Houston County's Code of Ordinances incorporates them by reference. Section 30-121, 'Adoption of the water resources protection ordinance,' states that Articles 1 through 4 of the Houston County Water Resources Protection Ordinance and the Local Design Manual are adopted in their entirety as the water quality and quantity policies applicable to all surface waters in unincorporated Houston County, with the like effect as if recited in the section itself. That means the operative drainage-design, water-quality, and stormwater-quantity standards, covering detention requirements and post-construction runoff controls tied to the county's NPDES Phase II municipal separate storm sewer permit, live in the separately bound Water Resources Protection Ordinance and the county's Local Design Manual rather than in the numbered sections of Chapter 30 itself, though both documents carry full legal force.
The same November 15, 2005 resolution also adopted the county's Water Resource Protection Overlay Districts for wetlands and river corridors under § 30-101, Article 8 of the same parent ordinance, and its groundwater recharge and minimum lot size policy under § 30-161, Article 7, showing the county built its water-related regulation as one consolidated ordinance split across several Code articles by subject. Site plans and subdivision applications reviewed by the county engineer must satisfy these incorporated water-quantity and water-quality policies in addition to the separate soil erosion and sedimentation permit required under Article III of the same chapter.
Violations & Fines
Chapter 30 does not print a separate stormwater fine schedule inside § 30-121 itself; violations of the incorporated Water Resources Protection Ordinance are enforced as Code of Ordinances violations under the general penalty in § 1-11, up to a $1,000 fine for a first or second offense, and for a third offense up to $1,000 plus as much as 60 days in the county jail, with each day of a continuing violation treated separately.
Frequently Asked Questions
Where are Houston County's stormwater design standards written down?
What federal program drives Houston County's stormwater rules?
Do stormwater rules apply everywhere in the county?
Sources & Official References
Other rules in Houston County
Compare Houston County to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.