Key Facts

Governing section
Code of Ordinances § 10.12.1
Design standard
NCDOT Highway Surface Drainage Handbook
Min. drainage course slope
1 ft fall per 200 ft
Curb/gutter trigger
Subdivisions over 30 lots
Protected waters
Lake Norman, Lookout Shoals Lake, Catawba River

Summary

Any new subdivision in unincorporated Iredell County must include a stormwater drainage plan built to NCDOT drainage standards before the preliminary plat is approved. The rule bars discharge into sanitary sewers and sets minimum grades and side slopes for drainage courses, with a flat ban on run-off flowing directly into Lake Norman, Lookout Shoals Lake or the Catawba River.

These county ordinances apply to unincorporated areas of Iredell County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The stormwater drainage plan shall be designed to meet the following objectives:1.The subdivider shall provide a stormwater drainage system constructed to the standards of the NCDOT... 5.Surface drainage courses shall have side slopes of at least three (3) feet of horizontal distance for each one (1) foot of vertical distance... 6.The minimum grade along the bottom of a surface drainage course shall be a vertical fall of at least one (1) foot in each two hundred (200) feet of horizontal distance... C.Curb and gutter development shall only be permitted when fifty (50) percent or more of the stormwater run-off is discharged into an on-site perennial or annual stream as determined by the most recent version of the U.S.G.S. topographic maps. No run-off may directly discharge into Lake Norman, Lookout Shoals Lake, or the Catawba River.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 32).

Full Breakdown

1 requires the developer or agent to submit a stormwater drainage plan, prepared by a design professional and showing existing topography and natural drainage, along with the preliminary subdivision plat. S. 12, Ch. 113A, Art. C. Dam Safety Law with proof filed before final plat approval; and special flood hazard areas must have adequate drainage to reduce flood exposure. 1(B) lets the Subdivision Administrator, on the Technical Review Committee's recommendation, require curb and gutter when a subdivision exceeds thirty lots, when steep topography creates a public-benefit need, or when an adjoining subdivision already has curb and gutter.

1(C) restricts curb-and-gutter development to sites where at least half the run-off discharges into an on-site perennial or annual stream (per current USGS topographic maps) and expressly forbids any direct discharge into Lake Norman, Lookout Shoals Lake, or the Catawba River, protecting the county's two reservoirs and the river that feeds them. 13.

Violations & Fines

Failure to submit an approved stormwater drainage plan blocks preliminary plat approval, and the Subdivision Administrator can withhold final plat approval until the drainage system, curb-and-gutter conditions, and the Lake Norman/Lookout Shoals/Catawba discharge ban are met. Non-compliant developers must redesign at their own cost before recording, and the county's general Code penalty under Sec. 1-7 (fine up to $50 or up to 30 days, or a $100 civil penalty) applies to violations of the underlying subdivision ordinance.

Frequently Asked Questions

Does Iredell County require a stormwater plan for new subdivisions?
Yes. Code of Ordinances Section 10.12.1 requires the developer to submit a stormwater drainage plan, prepared by a design professional and based on site topography, together with the preliminary subdivision plat, before the county will approve the plat.
Can stormwater run-off go straight into Lake Norman?
No. Section 10.12.1(C) expressly states no run-off may directly discharge into Lake Norman, Lookout Shoals Lake, or the Catawba River; curb-and-gutter systems are only permitted where at least half the run-off reaches an on-site perennial or annual stream instead.
When can the county require curb and gutter in a subdivision?
Under Section 10.12.1(B), the Subdivision Administrator may require curb and gutter when a proposed subdivision exceeds thirty lots, when steep topography creates a public benefit, or when an adjoining subdivision already has curb and gutter installed.

Sources & Official References

Other rules in Iredell County

All Iredell County rules

Compare Iredell County to another location·View the North Carolina environmental rules overview

Get notified when Stormwater Management in Iredell County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.