Skip to main content
CityRuleLookup

Wichita Falls, TX Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Applies to
1+ acre commercial/multifamily, 2+ acre residential
Standard
Runoff capped at predevelopment rate
Detention design storm
100-year storm plus 6-inch freeboard
Administered by
Department of Public Works
Agreement required
Recorded detention facilities agreement

Summary

New commercial, multifamily, or 2+ acre residential development in Wichita Falls must control stormwater runoff to predevelopment rates through on-site detention or an approved downstream assessment.

This article shall apply to all public drainage facilities; to any public or private commercial or multifamily residential development or redevelopment activity comprising a gross aggregate area of one acre or more; and to any single-family residential development comprising a gross aggregate area of two acres or more. ... The controlled release rate of stormwater runoff from development or redevelopment activities shall not exceed predevelopment conditions unless downstream facilities can be demonstrated to be sufficient to convey fully developed 100-year design storm flows from the watershed.

Full Breakdown

Wichita Falls applies its stormwater management article to any commercial or multifamily development of one acre or more and any single-family development of two acres or more. The controlled release rate of runoff from a development can't exceed predevelopment conditions unless the developer proves downstream drainage facilities can already handle fully developed 100-year storm flows. Compliance is usually met with an engineer-designed detention pond sized for the 100-year storm plus six inches of freeboard, built under a recorded detention facilities agreement with the city. Developers must also secure any required Corps of Engineers, TCEQ, FEMA, or EPA/TCEQ NPDES-TPDES permits tied to the drainage work.

Violations & Fines

Noncompliant drainage plans are rejected by the Department of Public Works engineering division before permitting; general Code violations carry fines up to $2,000 per offense (up to $4,000 for solid-waste-related violations), with each day a separate offense.

Frequently Asked Questions

Does every new house need a detention pond?
No. The one-acre/two-acre applicability thresholds mean most single-lot homes are exempt; it's aimed at subdivisions and larger commercial or multifamily sites.
Can a developer avoid building on-site detention?
Yes, by submitting a downstream impact assessment showing existing drainage facilities already handle fully developed 100-year storm flows without added detention.

Sources & Official References

Other rules in Wichita Falls

All Wichita Falls rules

Texas rules heatmap·Compare Wichita Falls to another location·View the Texas environmental rules overview

Get notified when Stormwater Management in Wichita Falls, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.