Summary
In Revere, a fence counts as a regulated 'structure' under the zoning code, so no fence may be built, altered or used until the building inspector issues a permit. The zoning ordinance defines structure to expressly include fences alongside buildings, sheds, signs and swimming pools, closing off any argument that fencing sits outside the permit system.
"Structure"means a combination of materials assembled at a fixed location requiring a permit to erect, place or construct, and includes, but is not limited to, buildings, stadiums, platforms, radio towers, sheds, storage bins, signs, swimming pools and fences. ... No building, structure or land shall be ... constructed, altered, occupied or used in whole or in part for any purpose until the appropriate certificates, permits and/or licenses have been issued by the building inspector.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4804778; v14 updated 2026-05-04).
Full Breakdown
Revere's zoning title treats a fence the same as a building for permitting purposes. Section 17.08.840 defines 'Structure' as 'a combination of materials assembled at a fixed location requiring a permit to erect, place or construct,' and it names fences directly in its list of examples alongside buildings, stadiums, platforms, radio towers, sheds, storage bins, signs and swimming pools. Because a fence meets that definition, Section 17.48.010 applies to it directly: no building, structure or land may be constructed, altered, occupied or used until the appropriate certificates, permits and licenses have been issued by the building inspector. A homeowner who puts up a fence without first getting a permit is in the same legal position as someone who builds an addition without one.
The permitting path runs through Article II of Chapter 17.48. Under Section 17.48.020 the building inspector issues a zoning permit once satisfied the proposed structure will not violate Title 17. Section 17.48.030 requires a written application detailed enough that the inspector can route copies to the city planner, city engineer, superintendent of public works and board of health for a 'formal project review,' and Section 17.48.050 gives those officials fourteen days to submit recommendations. A special permit from the city council is a separate track reserved for uses Title 17 flags for discretionary review; a routine residential fence normally proceeds through the zoning permit route instead.
Violations & Fines
Revere enforces Title 17 permit failures through the citywide general penalty at Section 1.16.010: a fine of not more than $300 for each offense, with every day the unpermitted fence remains in place counting as a separate offense. The building inspector can also withhold a certificate of occupancy or later permits until the fence is brought into compliance or removed.
Frequently Asked Questions
Does a fence need a permit in Revere?
Who reviews a Revere fence permit application?
What happens if I build a fence in Revere without a permit?
Sources & Official References
Other rules in Revere
Compare Revere to another location·View the Massachusetts fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Fence Permit Requirements in Nearby Cities
How other cities in this county handle fence permit requirements.