Skip to main content
CityRuleLookup

Shawnee County, KS Fence Regulations: Fence Permit Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit trigger height
6 feet or taller
Extension rule
Any extension needs a permit
Replacement trigger
50%+ of linear footage rebuilt
Fire hydrant clearance
5 feet
Amended
HR 2011-2 (2011); HR 2012-8 (2012)

Summary

Shawnee County requires a fence permit only when a new fence reaches six feet or taller, an existing fence is extended, or half or more of an existing fence's length is replaced, under Sec. 29.04(a) of the county Zoning Regulations.

These county ordinances apply to unincorporated areas of Shawnee County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

For all fences six (6) feet or greater in height, where a new fence is constructed or an existing fence is being extended, or 50% or more of the linear feet of the entire existing fence is being replaced or reconstructed, a fence permit shall be obtained. Any such replacement or reconstruction shall comply with all the provisions of this article.

Full Breakdown

Sec. 04(a)(1) of the Shawnee County Zoning Regulations draws the permit line at six feet: 'For all fences six (6) feet or greater in height, where a new fence is constructed or an existing fence is being extended, or 50% or more of the linear feet of the entire existing fence is being replaced or reconstructed, a fence permit shall be obtained. ' That means a fence under six feet generally does not need a permit, but any six-foot-plus fence, any extension of an existing fence regardless of the resulting height, or a replacement job touching half or more of an existing fence's total linear footage triggers the requirement, and the whole fence then has to meet every current standard in Article XXIX, not just the portion being rebuilt.

Sec. 04(a)(2) places the burden of locating boundaries on the applicant: the property owner is responsible for locating property lines, platted and recorded easements, and floodplain boundaries, and the permit application must include an accurate, to-scale site plan confirming those locations and dimensions. Once submitted, the planning department reviews the application but Sec. 04(c)(3) makes clear the department is not responsible for determining whether the fence will encroach on a utility or other easement; that risk stays with the applicant. A permit will not be issued until the county engineer confirms under Sec.

04(c)(2) that the fence location will not create a traffic hazard, per Sec. 24-132 of the Shawnee County Code. Fences are also barred from platted or recorded drainage easements under Sec. 04(c)(4) unless the Shawnee County Public Works Department determines the fence will not obstruct overland water flow or collect debris that causes backwater, and a five-foot clearance must be kept around fire hydrants under Sec. 04(c)(5) unless the applicable fire district waives it in writing. R. Resolution 2011-2, Sec. R. Resolution 2012-8, Sec. 2, effective October 8, 2012.

Violations & Fines

The zoning administrator enforces the fence permit requirement under Sec. 1.11 of the Zoning Regulations and can require an unpermitted six-foot-plus fence, extension, or major replacement to be permitted retroactively, modified, or removed. Because the applicant, not the county, bears responsibility for locating property lines and easements under Sec. 29.04(a)(2) and (c)(3), a fence built on a neighbor's land or in a utility easement can be ordered relocated even after a permit is issued.

Frequently Asked Questions

Do I need a permit for a 4-foot fence in Shawnee County?
No. Sec. 29.04(a)(1) only requires a fence permit for fences six feet or taller, for extending an existing fence, or for replacing 50 percent or more of an existing fence's length.
Who is responsible for finding my property line before building a fence?
You are. Sec. 29.04(a)(2) puts the burden on the property owner to locate property lines, easements and floodplain boundaries and to submit a scaled site plan confirming them with the permit application.
Will the county tell me if my fence will hit a utility easement?
No. Sec. 29.04(c)(3) states the planning department is not responsible for determining utility or other easement encroachment when issuing a permit, so that risk falls on the applicant.

Sources & Official References

Other rules in Shawnee County

All Shawnee County rules

Compare Shawnee County to another location·View the Kansas fence regulations overview

Get notified when Fence Permit Requirements in Shawnee County, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.