Skip to main content
CityRuleLookup

El Paso County, CO Fire Regulations: Brush Clearance (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum clearance
30 ft from structures
Trigger
Wildland Fire Hazard Mitigation Plan
Slash removal
before final building inspection
Road slash zone
150 ft from centerline

Summary

When a Wildland Fire and Hazard Mitigation Plan requires a fuel modification area, El Paso County's Land Development Code compels landowners to clear ground fuels and dead vegetation within at least 30 feet of structures.

City-specific rules exist: Colorado Springs has its own brush clearance rules that differ from El Paso County's county-level regulations. If you live in Colorado Springs, check the city-specific page instead.

When the Wildland Fire Risk and Hazard Mitigation Plan requires establishment of a fuel modification area: The modifications shall extend at least 30 feet from structures; Ground fuels within the defined defensible space shall be treated or removed; Live vegetation within the defensible space shall have dead material removed and shall be thinned and pruned.

Source: El Paso County Land Development CodeView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Land Development Code: Supplement 3 | Drainage Criteria Manual: Publication | Engineering Criteria Manual: Supplement 3 | Ordinances: Reformat).

Full Breakdown

Once a Wildland Fire Risk and Hazard Mitigation Plan calls for a fuel modification area, the Land Development Code requires the modifications to extend at least 30 feet from structures, ground fuels within that defensible space to be treated or removed, and live vegetation to have dead material removed, thinned, and pruned. Dead or downed fuels near buildings must be removed or treated, and slash may have to be cleared within 150 feet of new road centerlines before the county accepts the road, plus near home sites before final building inspection.

Violations & Fines

Skipping required fuel modification or leaving slash near home sites or new roads is enforced as a zoning violation and can block final building inspection or county acceptance of a subdivision road.

Frequently Asked Questions

How far must brush be cleared from a structure in unincorporated El Paso County?
At least 30 feet, per the Land Development Code's fuel modification standards, when a Wildland Fire and Hazard Mitigation Plan requires a fuel modification area.
Must slash be cleared before construction finishes?
Yes. Slash near home sites must be removed before final building inspection, and slash within 150 feet of new road centerlines must be cleared before the county accepts the road.

Sources & Official References

Other rules in El Paso County

All El Paso County rules

Compare El Paso County to another location·View the Colorado fire regulations overview

Get notified when Brush Clearance in El Paso County, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Brush Clearance in Cities Across El Paso County