Before You Build in Miramar, FL: Permit & Rule Checklist (2026)
Everything you need to know before starting a home improvement project
Building a fence, installing a pool, or adding a shed? Each project has its own set of local permits and rules in Miramar. This guide consolidates fence, pool, ADU, shed, fire pit, and landscaping regulations into one checklist so you know what to expect before you start.
Quick Permit Checklist
At-a-glance overview of permit categories in Miramar. Click any card for details.
Fences & Walls
3 rules on file
Swimming Pools
2 rules on file
ADUs & Granny Flats
2 rules on file
Sheds & Outbuildings
2 rules on file
Fire Pits & Outdoor Structures
1 rule on file
Landscaping & Tree Removal
3 rules on file
Fences & Walls
Some RestrictionsHeight limits, materials, permits, and shared fence rules.
Retaining Walls
Some RestrictionsMiramar doesn't set a citywide retaining wall height cap, but its Land Development Code does regulate retaining walls built within FEMA-mapped regulated floodways. Section 616.3 requires any retaining wall involving fill placement in a regulated floodway to meet the no-rise engineering standard in Section 612.4 before the city will permit it.
Fence Permit Requirements
Some RestrictionsMiramar requires a permit before any fence, wall, or landscaping goes into a utility easement, and Section 505.8 layers on an encroachment agreement for lots platted after January 1, 1996. Once that permit issues, the owner still must give any utility company access to the easement on demand, and the utility owes nothing for damage to the fence while it works there.
Height Limits
Some RestrictionsMiramar caps residential fences at six feet under Section 505.8, and front-yard fences are only allowed at all in the Rural, Estate, and RS1 districts, still capped at six feet and subject to the code's clear sight triangle rules. Non-residential fences run higher: eight feet next to residential property and ten feet next to other non-residential property.
Swimming Pools
Heavy RestrictionsPool permits, safety fencing, and drainage requirements.
Pool Permits
Some RestrictionsPermit required if >24 inches deep. Barrier requirements apply. Walls 48+ inches may serve as barrier with lockable ladder. Electrical permit for pump.
Fencing & Safety Requirements
Heavy RestrictionsAt least 2 safety features per FL Ch. 515. Drain covers per VGB Act. Maintain clear water. Abandoned pools must be drained.
ADUs & Granny Flats
Some RestrictionsAccessory dwelling unit rules and garage conversion permits.
ADU Rules
Some RestrictionsMiramar allows one accessory dwelling unit per lot as an accessory to a single-family detached home, capping it at 1,200 square feet, requiring it stay under 50% of the primary home's floor area and under two stories, per Land Development Code Β§ 405.1.
Garage Conversions
Some RestrictionsMiramar lets homeowners convert a detached garage or other accessory structure into an accessory dwelling unit, but only if the resulting unit is a permitted use and meets every ADU code requirement, and the conversion can never create or expand a zoning nonconformity.
Sheds & Outbuildings
Some RestrictionsShed permits, setback limits, and outbuilding size rules.
Shed & Carport Rules
Some RestrictionsMiramar's Table 505-1 accessory-use standards cap utility sheds at 240 square feet and 10 feet tall, but only in the Rural, Estate, and Residential Single-Family 1 districts, where sheds need a 25-foot side and rear setback. Everywhere else on single-family, duplex, or triplex lots, sheds max out at 100 square feet and 8 feet tall with just a 3-foot side and rear setback.
Tiny Homes
Some RestrictionsMiramar's Land Development Code defines a tiny home as any residential structure under 600 square feet, then sets its own floor-area floor: Table 402-4 requires a minimum 300 square feet for a tiny house, the same minimum the table sets for accessory dwelling units.
Fire Pits & Outdoor Structures
Heavy RestrictionsFire pit placement, outdoor burning restrictions, and permits.
Outdoor Burning
Heavy RestrictionsMiramar bars all outdoor fires, including backyard fire pits, under City Code Sec. 9-2 except for noncommercial outdoor food preparation, frost-protection heaters, fire department drills, or a city commission temporary use permit for on-site land-clearing burns.
Landscaping & Tree Removal
Significant RestrictionsTree removal permits, heritage tree protections, and water rules.
Tree Removal & Heritage Trees
Significant RestrictionsMiramar requires a Tree Removal/Relocation Permit before cutting down, relocating or encroaching on the dripline of any tree two inches or larger in caliper anywhere in the city. Section 506.14.5 limits when the Community Development Department can issue one, and approved permits under Section 506.14.6 are valid for only 90 days.
Tree Trimming
Some RestrictionsMiramar's Land Development Code makes every property owner responsible for keeping trees and hedges trimmed clear of street lighting, sight lines and sidewalks. Section 506.12.1 caps shrub height at three feet near driveways and intersections, requires removal of low branches obstructing streetlights, and mandates root barriers where roots are lifting a public sidewalk.
Water Restrictions
Some RestrictionsMiramar bans all landscape irrigation citywide between 10:00 a.m. and 4:00 p.m. every day under City Code Β§ 21-62(a). Existing landscaping at even-numbered addresses may water only Thursdays and/or Sundays; odd-numbered addresses only Wednesdays and/or Saturdays, implementing the South Florida Water Management District's year-round conservation rules.
General Permit Tips
When do you typically need a permit?
Most cities require permits for structural work, including fences over a certain height, pools, ADUs, and sheds above a size threshold. Even projects that seem minor can trigger permit requirements, so it is always best to check first.
How to apply for a building permit
Visit your local building department or their website. Most jurisdictions accept online applications. You will typically need a site plan, project description, and may need contractor information. Processing times vary from same-day for simple projects to several weeks for larger builds.
Common permit violations to avoid
Building without a permit, exceeding approved dimensions, and ignoring setback requirements are the most common violations. Penalties can include fines, required removal of the structure, and complications when selling your home.