Birmingham, AL Hurricane Preparedness: Flood Elevation (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Elevation standard
1 ft above base flood elevation
Applies to
New construction & substantial improvements
Permit required
Floodplain development permit before work begins
Certification
As-built elevation cert by surveyor/engineer
Enforcing agency
Dept. of Planning, Engineering & Permits
Penalty
Up to $500 fine or 180 days
Variance authority
Zoning Board of Adjustment

Summary

In Birmingham's mapped special flood hazard areas, the Zoning Ordinance requires new or substantially improved residential structures to elevate the lowest floor, including any basement, at least one foot above the base flood elevation. A floodplain development permit and an as-built elevation certification, prepared by a licensed surveyor or engineer, are required before and after construction.

(1)Residential construction. New construction or substantial improvement of any residential structure (or manufactured home) shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movement of floodwaters shall be provided in accordance with standards of subsection 5, part b(2)...h.Penalties for violation. Violation of the provisions of this section or failure to comply with any of its requirements, including violation of conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a misdemeanor. Any person who violates this section or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $500.00 or imprisoned for not more than 180 days, or both, and in addition shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 3).

Full Breakdown

Birmingham's Zoning Ordinance, Appendix D, Section 10 (Floodplain Zone Districts) governs construction inside the areas of special flood hazard shown on the city's Flood Insurance Rate Maps, based on the 1980 Flood Insurance Study for Birmingham and Jefferson County. c. b(1) sets the residential standard: new construction or substantial improvement of a residential structure or manufactured home must have its lowest floor, including the basement, elevated no lower than one foot above the base flood elevation. Where solid foundation perimeter walls elevate the structure, the walls need openings sized to let floodwaters pass through automatically.

Nonresidential buildings can meet the same one-foot elevation or be engineer-certified as floodproofed instead. 3 of the Administration chapter to collect that same elevation certification before further vertical construction proceeds. Manufactured homes and recreational vehicles have their own anchoring and elevation rules, and any variance from the one-foot standard goes through the Zoning Board of Adjustment.

Violations & Fines

Violating Section 10 or ignoring its permit and elevation-certification requirements, including any condition attached to a variance, is a misdemeanor: conviction carries a fine of up to $500.00 or up to 180 days imprisonment, or both, plus case costs, and each day the violation continues is a separate offense.

Frequently Asked Questions

How high above flood level must a new Birmingham home be built?
Section 10, subsection 5.b(1) of the Zoning Ordinance requires the lowest floor, including any basement, of new or substantially improved residential construction in a mapped special flood hazard area to sit at least one foot above the base flood elevation shown on the city's Flood Insurance Rate Map.
Do I need a permit before building in a Birmingham flood zone?
Yes. Subsection 3.c requires a floodplain development permit from the Department of Planning, Engineering and Permits before any development activity begins in an area of special flood hazard, in addition to the standard building permit required under the Administration chapter.
Who certifies that my house was actually built high enough?
A registered land surveyor, professional engineer, or architect must certify the as-built elevation of the lowest floor once the horizontal structural members are in place, and submit it to the Director of Planning, Engineering and Permits before further vertical construction is allowed to continue, under subsection 4.c(2).

Sources & Official References

Other rules in Birmingham

All Birmingham rules

Compare Birmingham to another location·View the Alabama hurricane preparedness overview

Get notified when Flood Elevation in Birmingham, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.