Franklin County, NC Hurricane Preparedness: Flood Elevation (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard requirement
BFE plus 4 feet, UDC § 9.2.2
No-BFE minimum
At least 4 feet above highest adjacent grade
Residential standard
Reference level elevated to RFPE, § 9.2.5(B)(1)
Enforcing official
Franklin County Floodplain Administrator (Planning Director)
Criminal penalty
Class 1 misdemeanor, fine up to $100, G.S. § 143-215.58
Required certificate
FEMA Form 086-0-33 before occupancy

Summary

In unincorporated Franklin County's mapped Special Flood Hazard Areas, new residential construction and substantial improvements must have their lowest floor elevated to the Regulatory Flood Protection Elevation, which UDC § 9.2.2 defines as the FEMA Base Flood Elevation plus 4 feet of freeboard, or at least 4 feet above the highest adjacent grade where no BFE has been set.

These county ordinances apply to unincorporated areas of Franklin County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

"Regulatory Flood Protection Elevation" means the "Base Flood Elevation" plus the "Freeboard". In "Special Flood Hazard Areas" where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus 4' freeboard. In "Special Flood Hazard Areas" where no BFE has been established, this elevation shall be at least 4' above the highest adjacent grade. ... New construction or substantial improvement ... of any residential structure (including manufactured homes) shall have the reference level, including basement, elevated no lower than the Regulatory Flood Protection Elevation, as defined in 9.3.2.

Full Breakdown

The Unified Development Code's Flood Damage Prevention article defines the standard a builder must hit before Planning and Inspections, acting as Floodplain Administrator, will sign off on a floodplain development permit. Section 9.2.2 defines the Regulatory Flood Protection Elevation as the Base Flood Elevation plus a 4-foot freeboard in any Special Flood Hazard Area where FEMA has published a BFE, or at least 4 feet above the highest adjacent grade where no BFE exists. Section 9.2.5(B)(1) then applies that number directly to homes: new construction or substantial improvement of any residential structure, including a manufactured home, must have its reference level, including any basement, elevated no lower than the Regulatory Flood Protection Elevation.

A nonresidential structure faces the same elevation requirement under § 9.2.5(B)(2), though it may instead be floodproofed to that same elevation if a registered professional engineer or architect certifies that the design keeps the structure watertight against hydrostatic and hydrodynamic loads. Before construction, an applicant must submit a plot plan certified by a surveyor or engineer showing the proposed elevation relative to NAVD 1988, and after construction, a Finished Construction Elevation Certificate, FEMA Form 086-0-33, must be filed with the Floodplain Administrator before a Certificate of Occupancy is issued; deficiencies must be corrected before that certificate can be released.

The freeboard requirement exists on top of, not instead of, whatever FEMA's mapped Base Flood Elevation already calls for, so a homeowner rebuilding after storm damage in a mapped hazard area needs to build 4 feet higher than the FEMA number, not just to it.

Violations & Fines

Violating the Flood Damage Prevention article is a Class 1 misdemeanor under G.S. § 143-215.58, punishable by a fine of not more than $100.00 or up to 30 days imprisonment, with each day of continued violation a separate offense. The Floodplain Administrator can also order corrective action, including altering, vacating, or demolishing a noncompliant structure, following a hearing and a correction period of 60 to 180 days.

Frequently Asked Questions

How high above the flood map must a new house be built in Franklin County?
UDC § 9.2.5(B)(1) requires new or substantially improved residential structures in a mapped Special Flood Hazard Area to have their reference level, including any basement, elevated no lower than the Regulatory Flood Protection Elevation, which § 9.2.2 defines as the FEMA Base Flood Elevation plus a 4-foot freeboard.
What if FEMA has not published a Base Flood Elevation for my lot?
Where no BFE has been established, UDC § 9.2.2 sets the Regulatory Flood Protection Elevation at a minimum of 4 feet above the highest adjacent grade at the site, and § 9.2.5(C) requires that same standard be used for new construction and substantial improvements until better data becomes available.
What proof does Franklin County require after a flood-zone home is built?
The Floodplain Administrator requires a Finished Construction Elevation Certificate, FEMA Form 086-0-33, certifying the as-built elevation of the reference level and all attendant utilities before issuing a Certificate of Compliance or Occupancy under § 9.2.4(B)(4); deficiencies must be corrected before that certificate will be released.

Sources & Official References

Other rules in Franklin County

All Franklin County rules

Compare Franklin County to another location·View the North Carolina hurricane preparedness overview

Get notified when Flood Elevation in Franklin County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.