Skip to main content
CityRuleLookup

Jefferson County, MO Landscaping Rules: Composting (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Zones allowed
Conditional use only in RA-5 and LR-2 districts
Minimum lot size
Two (2) acres
Operating hours
7:00 a.m. to 6:00 p.m., Monday through Saturday
Standard buffer
50 feet; 100 feet near homes within 200 feet
Screening option
15-foot planted or 50-foot natural buffer
Maximum penalty
$1,000 fine or one year in jail, per day
Governing section
UDO Section 400.3145

Summary

Yard waste composting facilities that produce compost for resale run only as a conditional use in Jefferson County's RA-5 and LR-2 residential districts. UDO Section 400.3145 caps hours at 7:00 a.m. to 6:00 p.m., Monday through Saturday, requires a two-acre minimum lot, and sets buffers of 50 to 100 feet from neighboring homes before the County Council will approve a site plan.

These county ordinances apply to unincorporated areas of Jefferson County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Composting facilities are conditional uses in the "RA-5" and "LR-2" residential zone districts. The purpose of these facilities is to receive yard waste and produce compost for the purpose of resale provided they meet the following conditions... 2. Lot. These facilities shall be located on parcels a minimum of two (2) acres in size. 3. Hours of operation. The facilities may operate between the hours of 7:00 a.m. and 6:00 p.m., Monday through Saturday... 5. Buffers. a. A minimum of a fifty (50) foot buffer shall be required on all sides of the site where no residential structures are within two hundred (200) feet of the site. b. When located next to existing residential structures that are within two hundred (200) feet of the site, a one hundred (100) foot buffer shall be required.

Full Breakdown

Jefferson County treats a yard-waste composting operation as a conditional use, allowed only in the "RA-5" and "LR-2" residential zone districts under UDO Section 400.3145. The stated purpose is to let an operator receive yard waste and turn it into compost for resale, but the applicant must clear a detailed site-plan review before the Planning Division: the plan has to show the dimensions of the operating area, the property boundaries if they differ from that area, the location of every compost pile and existing or proposed structure, the distance from the operation to each property line, all rights-of-way and easements, any off-site structures within 200 feet of the property line, and the existing or proposed access point.

The facility needs a minimum parcel of two acres and can run only between 7:00 a.m. and 6:00 p.m., Monday through Saturday. Access must be approved by whichever state, county or road district controls the entrance road, the entrance has to be lit, access points must carry signs warning of truck traffic, and the operator has to avoid routing trucks through a private subdivision.

Buffers scale with how close neighbors sit: a 50-foot buffer runs along every side of the site where no residential structure sits within 200 feet, but that buffer grows to 100 feet on any side that does have a residential structure within 200 feet. Where screening is required because a home sits closer than 200 feet, the operator can use a 50-foot natural buffer, a 15-foot planted buffer, or a Planning Division-approved combination as long as the natural portion is at least 25 feet deep. The County's Stormwater Division reviews the site for erosion and sediment control needs, and any structure built for the operation still needs its own building permit before construction starts.

Violations & Fines

UDO Section 400.140 makes any use of land in violation of these zoning regulations, including an unpermitted or noncompliant composting facility, a misdemeanor punishable by a fine up to $1,000, up to one year in jail, or both, with each day of continued violation counted as a separate offense. The Director of County Services and Code Enforcement can inspect the site, order the violation corrected in writing, and the County can seek injunctive relief in Circuit or Municipal Court.

Frequently Asked Questions

Can I open a composting business in Jefferson County?
Only as a conditional use in the RA-5 or LR-2 residential districts, and only on a parcel of at least two acres. You need Planning Division site-plan approval covering compost pile locations, access, buffers and erosion controls before the County Council will let the operation start under UDO Section 400.3145.
What hours can a yard-waste composting facility run?
UDO Section 400.3145 limits operation to 7:00 a.m. through 6:00 p.m., Monday through Saturday. There is no allowance for Sunday operation or hours outside that window, and the County's conditional-use approval can add stricter limits case by case.
How close can compost piles sit to my house?
The site needs a 50-foot buffer on every side unless a residential structure sits within 200 feet, in which case the buffer grows to 100 feet. Screening such as a 15-foot planted buffer can also be required to shield nearby homes from the compost piles.
What is the penalty for violating Jefferson County's composting facility rules?
Operating outside the approved conditions is a misdemeanor under UDO Section 400.140, carrying a fine up to $1,000, up to a year in jail, or both, with every day of the violation charged separately. The County's Director of Code Enforcement can also order the condition corrected.

Sources & Official References

Other rules in Jefferson County

All Jefferson County rules

Compare Jefferson County to another location·View the Missouri landscaping rules overview

Get notified when Composting in Jefferson County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.