Pierce County, WA Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum system size
1,500 gallons per structure for base credit
Base credit tier
10-year retention facility rate
Top credit tier
Matches 100-year storm retention facility
Program sunset
Pre-2017 Credit Program ends Jan. 1, 2027
Max credit cap
$12,500 per parcel, 2021 onward
Plumbing permit fee
$0.00 under Table 17C.10-1-D
Delinquent charge interest
12% per year under PCC 11.02.080

Summary

Pierce County credits roof rainwater collection systems against the county's stormwater utility service charge under PCC 11.02.050.B.7. A system that captures at least 1,500 gallons per structure for later nonpotable use earns the same discount as a 10-year retention facility, and larger systems that can be drained within 24 hours qualify for higher credit tiers, but the whole program sunsets January 1, 2027.

City-specific rules exist: Tacoma has its own rainwater harvesting rules that differ from Pierce County's county-level regulations. If you live in Tacoma, check the city-specific page instead.

7. Roof rainwater collection systems, which retain stormwater on site for later nonpotable use, will be credited as retention facilities. Systems that are properly sized for their intended use and have a capacity of at least 1,500 gallons per structure will be assigned the same credit as a 10-year Retention Facility. Larger systems capable of retaining the 25-, 50- or 100-year storms will be credited at the higher level as long as the stored water can be utilized within a 24-hour period. Refer to Volume III of the Pierce County Stormwater Management and Site Development Manual for roof rainwater collection systems.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-515, and legislation passed through May 26, 2026).

Full Breakdown

A. B, which the code reviser's note confirms sunsets on January 1, 2027. 7: a system sized to hold at least 1,500 gallons per structure for later nonpotable use is credited at the same rate as a 10-year retention facility, while systems built to retain the 25-, 50- or 100-year storm earn the matching higher retention-facility credit tier, as long as the stored water can be used within 24 hours. Design guidance sits in Volume III of the Pierce County Stormwater Management and Site Development Manual. 5. 10. 010.

Violations & Fines

There is no separate fine written into PCC 11.02.050 for a misapplied rainwater harvesting credit, but the underlying service charge does not disappear: if a credit is denied or the balance goes unpaid, PCC 11.02.080 lets Pierce County record a lien enforced the same way as a sewerage lien, and delinquent service charges accrue 12 percent annual interest, computed monthly, until the parcel is paid current.

Frequently Asked Questions

Does Pierce County charge a fee to install a rainwater harvesting system?
No. The plumbing permit fee table adopted under PCC 17C.10.070, Table 17C.10-1-D, lists the fee for a 'Rainwater Harvesting System' at $0.00 for both 2026 and 2027. A plumbing permit is still required, and the installation must meet the Uniform Plumbing Code standards Pierce County adopted at PCC 17C.50.010.
How much stormwater credit can a rainwater harvesting system earn?
Under PCC 11.02.050.B.7, a roof rainwater collection system that holds at least 1,500 gallons per structure for later nonpotable use qualifies for the same credit as a 10-year retention facility. Systems engineered to retain larger 25-, 50- or 100-year storms earn the corresponding higher retention-facility credit tier, provided the stored water can be used within 24 hours.
Is the rainwater harvesting stormwater credit permanent?
No. It runs under the Pre-2017 Credit Program in PCC 11.02.050.B, available only to properties that qualified before October 1, 2016 and kept current with annual maintenance certifications. The code reviser's note attached to PCC 11.02.050.B confirms the whole subsection, including the rainwater collection credit, sunsets on January 1, 2027.

Sources & Official References

Other rules in Pierce County

All Pierce County rules

Compare Pierce County to another location·View the Washington landscaping rules overview

Get notified when Rainwater Harvesting in Pierce County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.