Washington County, MD Landscaping Rules: Rainwater Harvesting (2026)
Key Facts
- Governing law
- SWM, Grading, Soil Erosion & Sediment Control Ordinance
- Status
- Approved ESD treatment practice, not mandatory
- Design standard
- County Design Manual & Public Works Standards
- Tank check
- Top elevation must be below the frost line
- Enforcing agency
- Division of Plan Review and Permitting
Summary
Washington County lists rainwater harvesting as an approved environmental site design (ESD) stormwater treatment practice for new development. Developers may use cisterns and storage tanks to meet county runoff-reduction requirements instead of building a pond or larger structural facility.
b. The following ESD treatment practices shall be designed according to the Design Manual and the latest adopted version of the Washington County Standards and Specifications for Public Works Construction to satisfy the applicable minimum control requirements established in Section 3.5. and Section 3.6.2. of this Article: (a) Disconnection of rooftop runoff; (b) Disconnection of non-rooftop runoff; (c) Sheet flow to conservation areas; (d) Rainwater harvesting; (e) Submerged gravel wetlands; (f) Landscape infiltration; (g) Infiltration berms; (h) Dry wells; (i) Micro-bioretention; (j) Rain gardens; (k) Swales; (l) Enhanced filters; and (m) Any practices approved by the Director of DPRP and the Maryland Department of the Environment.
Full Breakdown
1). b). d). 15, Rainwater Harvesting inspection checklist). If a harvesting system is deeded to the county for public ownership and maintenance, the developer must also record the lot corners and follow the county's Policy on Construction of Infrastructure for Acceptance and Ownership (S-3) before conditional acceptance is granted. Rainwater harvesting is optional, not mandated: a project can meet its stormwater obligations through any qualifying combination of the listed ESD practices, so a builder who prefers rooftop disconnection or a rain garden instead faces no penalty for skipping harvesting altogether.
Violations & Fines
A stormwater management plan, including any rainwater harvesting component, must be approved by the Division of Plan Review and Permitting before a grading or building permit issues. Building without an approved SWM plan, or deviating from the approved design during construction, blocks issuance of the as-built certification and the use-and-occupancy permit, and can trigger a stop-work order from the Division until the nonconformance is corrected.
Frequently Asked Questions
Is rainwater harvesting required for new construction in Washington County, Maryland?
What does the county check on an underground rainwater harvesting tank?
Can a rainwater harvesting system conflict with other Washington County rules?
Sources & Official References
Other rules in Washington County
Compare Washington County to another location·View the Maryland landscaping rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.