St. Tammany Parish, LA Landscaping Rules: Tree Removal & Heritage Trees (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Tree removal permit rules in St. Tammany Parish, LA, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Permit required for
SF lots 5+ acres (non-subdivision)
Two-family threshold
Lots 0.5 acre or more
Subdivision threshold
6+ lots on 5+ acres
Permit validity
2 years
Natural area buffer
50 ft along external roadways
Lot-size incentive
5% per 5% extra natural area, cap 20%

Summary

In unincorporated St. Tammany Parish, clearing land or removing trees ahead of construction requires a land clearing permit under UDC Section 600-3.2, but only above certain thresholds: single-family lots of 5 acres or more, two-family lots of a half-acre or more, and larger subdivisions all need the permit before a building or site-work permit can issue. Smaller residential lots are exempt.

These county ordinances apply to unincorporated areas of St. Tammany Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

B.Applicability.1.Permit required. A land clearing permit is required, prior to the issuance of a building permit or site work permit, for any type of tree removal or land clearing work associated the following development types:a.Residential, including:i.Single-family residential developments on individual lots measuring 5 acres or more, and not a part of a platted subdivision; andii.Two-family residential developments on individual lots measuring 0.5 acre or more.2.Exempted developments. The following proposed developments shall be exempt from the land clearing regulations of this section:a.Single-family residential developments on individual lots measuring less than 5 acres and not part of a platted subdivision; andb.Two-family residential developments on lots measuring less than 0.5 acres.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).

Full Breakdown

5 acre or more, multi-family developments of 3 or more units, subdivisions creating 6 to 24 lots on more than 5 acres, and any subdivision of 25 lots or more, along with most nonresidential and forestry or agricultural projects of 5 acres or larger. 5 acre, and forestry or agricultural clearing of 5 acres or less. 2(B)(6), and every permitted site must preserve a Natural Area buffer, generally 50 feet along external roadways per Exhibit 600-3-1-1, with narrower 25-foot street and 50-foot side and rear buffers for large single lots outside a subdivision. 3. 2(B)(7) bars any zoning map amendment to a more intense district for 3 years after a land clearing permit issues on the site.

Violations & Fines

Clearing land or removing trees on a site that meets the Section 600-3.2(B)(1) thresholds without first obtaining a land clearing permit blocks issuance of the building or site work permit the project needs, and Section 600-3.2(C)(3) limits the Department of Planning and Development's grounds for denying a compliant application to a lack of site access or a failure to meet Chapter 600 standards. Clearing performed under a permit obtained on inaccurate information is subject to the same suspension and revocation authority the Director holds over any UDC permit under Section 300-2(J).

Frequently Asked Questions

Do I need a permit to clear trees on my property in St. Tammany Parish?
Only above certain size thresholds. Section 600-3.2(B)(1) requires a land clearing permit for a single-family lot of 5 acres or more outside a platted subdivision, a two-family lot of 0.5 acre or more, or any qualifying subdivision or nonresidential project; smaller single-family and two-family lots are exempt under Section 600-3.2(B)(2).
How long does a St. Tammany land clearing permit last?
Two years. Section 600-3.2(B)(6) requires all permitted clearing activity and a compliance inspection to be completed within that period before the permit expires.
Can I reduce my lot size requirement by preserving trees?
Yes. Section 600-3.2(D)(5) grants a 5 percent reduction in minimum lot area or width for every 5 percent of additional natural area a developer preserves beyond the required buffer, capped at a 20 percent total reduction.

Sources & Official References

Other rules in St. Tammany Parish

All St. Tammany Parish rules

Compare St. Tammany Parish to another location·View the Louisiana landscaping rules overview

Get notified when Tree Removal & Heritage Trees in St. Tammany Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.