Bonneville County, ID Landscaping Rules: Tree Removal & Heritage Trees (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Tree removal permit rules in Bonneville County, ID, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Permit required for
Tree trimming or removal in ROW
Issuing department
County Department (Public Works)
Insurance requirement
$500,000 public liability coverage
First violation fine
$100 infraction
Repeat violation penalty
Up to $300 fine, 1 month jail
Permit revocation
Without advance notice for noncompliance

Summary

Removing a tree in a Bonneville County road right-of-way requires a right-of-way permit. Code § 153.04(B)(3) lists 'tree trimming or removal' among the activities the county Department must approve before work starts in the right-of-way, alongside utility work, driveway tie-ins and drainage changes.

These county ordinances apply to unincorporated areas of Bonneville County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 153.04 RIGHT-OF-WAY PERMIT REQUIRED.

(A) All construction, maintenance or other type of work performed in the county's right-of-way shall require a right-of-way permit. The permit is to be issued by the Department after review and approval by Department staff.

(B) All criteria used for design, location, depth and the like of proposed work shall adhere to the current version of the Department's standard specifications and drawings. The following activities shall require a right-of-way permit: ...

(3) Tree trimming or removal;

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-1: Ordinance 280-26, passed 1-20-2026).

Full Breakdown

Section 153.04 requires a right-of-way permit for construction, maintenance or other work performed in the county's right-of-way, and subsection (B) enumerates the specific activities that trigger the requirement. Item (3) is 'tree trimming or removal,' placed alongside utility construction and maintenance, driveway and parking tie-ins to the edge of oil mat or back of curb, modification of drainage swales, curb, gutter, sidewalk or paving work not under county contract, and other right-of-way activity such as temporary storage or stockpiling. All of these activities must meet the criteria in the Department's current standard specifications and drawings for design, location and depth.

To remove a tree from the right-of-way, the applicant submits a permit application to the Department under § 153.05, which can include site plans or other data the Department needs to evaluate the request. The Department then reviews the application under § 153.06, weighing possible hazards and risks the work could pose to the traveling public, and can deny a permit that conflicts with current standards. Before a permit for construction-type right-of-way work issues, the applicant must also file proof of $500,000 public liability insurance under § 153.07 and a cash deposit or bond under § 153.08 guaranteeing the work is performed correctly for one year after completion. Once issued, the Department retains inspection access under § 153.20 and can revoke the permit without advance notice under § 153.12 if the work does not comply with the standard specifications, requiring a new permit before work can resume.

Violations & Fines

Right-of-way violations, including tree removal performed without the § 153.04 permit, are penalized under § 153.99: a first violation draws a $100 fine as an infraction, and a second or later violation becomes a misdemeanor punishable by up to a $300 fine, up to one month in jail, and restitution. Each separate day the violation continues is charged as a distinct offense.

Frequently Asked Questions

Do I need a permit to remove a tree in Bonneville County?
Only if the tree is in the county road right-of-way. Code § 153.04(B)(3) lists 'tree trimming or removal' among the work that requires a right-of-way permit from the county Department before it starts, the same as utility work, driveway tie-ins and drainage changes performed in the right-of-way.
What do I need to submit for the permit?
Section 153.05 lets the Department require site plans, engineering plans or other data needed to evaluate the request, and § 153.07 requires proof of $500,000 public liability insurance before the Department issues a right-of-way permit for construction-type work such as tree removal.
What if I remove a right-of-way tree without a permit?
A first violation of Chapter 153 is an infraction punishable by a $100 fine under § 153.99. A second or later violation becomes a misdemeanor with a fine of up to $300 and up to one month in jail, and every day the violation continues counts as a separate offense.

Sources & Official References

Other rules in Bonneville County

All Bonneville County rules

Compare Bonneville County to another location·View the Idaho landscaping rules overview

Get notified when Tree Removal & Heritage Trees in Bonneville County, ID changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.