Bonneville County, ID Landscaping Rules: Tree Removal & Heritage Trees (2026)
Tree removal permit rules in Bonneville County, ID, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.
Key Facts
- Permit required for
- Tree trimming or removal in ROW
- Issuing department
- County Department (Public Works)
- Insurance requirement
- $500,000 public liability coverage
- First violation fine
- $100 infraction
- Repeat violation penalty
- Up to $300 fine, 1 month jail
- Permit revocation
- Without advance notice for noncompliance
Summary
Removing a tree in a Bonneville County road right-of-way requires a right-of-way permit. Code § 153.04(B)(3) lists 'tree trimming or removal' among the activities the county Department must approve before work starts in the right-of-way, alongside utility work, driveway tie-ins and drainage changes.
§ 153.04 RIGHT-OF-WAY PERMIT REQUIRED.
(A) All construction, maintenance or other type of work performed in the county's right-of-way shall require a right-of-way permit. The permit is to be issued by the Department after review and approval by Department staff.
(B) All criteria used for design, location, depth and the like of proposed work shall adhere to the current version of the Department's standard specifications and drawings. The following activities shall require a right-of-way permit: ...
(3) Tree trimming or removal;
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-1: Ordinance 280-26, passed 1-20-2026).
Full Breakdown
Section 153.04 requires a right-of-way permit for construction, maintenance or other work performed in the county's right-of-way, and subsection (B) enumerates the specific activities that trigger the requirement. Item (3) is 'tree trimming or removal,' placed alongside utility construction and maintenance, driveway and parking tie-ins to the edge of oil mat or back of curb, modification of drainage swales, curb, gutter, sidewalk or paving work not under county contract, and other right-of-way activity such as temporary storage or stockpiling. All of these activities must meet the criteria in the Department's current standard specifications and drawings for design, location and depth.
To remove a tree from the right-of-way, the applicant submits a permit application to the Department under § 153.05, which can include site plans or other data the Department needs to evaluate the request. The Department then reviews the application under § 153.06, weighing possible hazards and risks the work could pose to the traveling public, and can deny a permit that conflicts with current standards. Before a permit for construction-type right-of-way work issues, the applicant must also file proof of $500,000 public liability insurance under § 153.07 and a cash deposit or bond under § 153.08 guaranteeing the work is performed correctly for one year after completion. Once issued, the Department retains inspection access under § 153.20 and can revoke the permit without advance notice under § 153.12 if the work does not comply with the standard specifications, requiring a new permit before work can resume.
Violations & Fines
Right-of-way violations, including tree removal performed without the § 153.04 permit, are penalized under § 153.99: a first violation draws a $100 fine as an infraction, and a second or later violation becomes a misdemeanor punishable by up to a $300 fine, up to one month in jail, and restitution. Each separate day the violation continues is charged as a distinct offense.
Frequently Asked Questions
Do I need a permit to remove a tree in Bonneville County?
What do I need to submit for the permit?
What if I remove a right-of-way tree without a permit?
Sources & Official References
Other rules in Bonneville County
Compare Bonneville County to another location·View the Idaho landscaping rules overview