Lexington County, SC Noise Ordinances: Construction Hours (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Construction hours in Lexington County, SC, sometimes called construction noise rules or contractor work-hour ordinances, set when contractors can run power tools, hammers, and heavy equipment.

Key Facts

Debris grinding hours
7:00 a.m. to 7:00 p.m., § 21.21.i
Completion deadline
Must finish within 60 days of start
Public road exception
Road projects exempt from hours/60-day rule
Noise decibel exemption
Construction/demolition noise exempt from § 24.13 caps
General noise law
Ch. 26, Art. II still bars disturbing noise

Summary

Lexington County doesn't cap general construction noise by the clock, construction, grading, and demolition activity is exempt from the zoning ordinance's decibel limits, but on-site grinding or recycling of construction debris is restricted to 7:00 a.m. to 7:00 p.m. and must wrap up within 60 days.

These county ordinances apply to unincorporated areas of Lexington County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

[§ 21.21.i] Temporary construction, grading, and/or demolition activities which are necessary and incidental to the development or maintenance of a principal activity, utilities, or public infrastructure. The on-site grinding/recycling of construction debris shall be limited to the hours of 7:00 a.m. until 7:00 p.m. and shall be completed within 60 days of the initial construction, with the exception of public road projects, which are exempt from such provisions. [§ 24.14.d] Temporary Activities: Noise generated from construction, grading, and demolition activities which are necessary and incidental to the development of a principal activity or noise generated from activities not regulated by this Ordinance as described in Article 2, Chapter 1, Section 21.21 of this Ordinance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 20).

Full Breakdown

Zoning Ordinance § 21.21.i lists temporary construction, grading, and demolition activity as an allowed accessory use to a principal activity, utility, or public infrastructure project, then singles out one piece of that work for a clock: the on-site grinding and recycling of construction debris is limited to the hours of 7:00 a.m. until 7:00 p.m. and must be completed within 60 days of the initial construction, with public road projects exempt from that limit entirely.

That hours restriction sits inside a broader exemption. Section 24.14.d of the Performance Standards chapter exempts noise generated from construction, grading, and demolition activities necessary and incidental to developing a principal activity from the ordinance's maximum sound-pressure limits in § 24.13, which otherwise cap noise at 75 decibels near Restrictive Development Districts and grandfathered residential uses (85 decibels near Intensive Development Districts), stepped down 5 decibels between 7:00 p.m. and 7:00 a.m. Because construction and demolition noise is carved out of that decibel cap, a contractor's saws, generators, and equipment aren't held to the county's numeric noise ceiling or its nighttime reduction; the debris-grinding clock in § 21.21.i is the one hard time restriction the ordinance actually imposes on a construction site.

Separately, the county-wide noise ordinance in Chapter 26, Article II bars loud, unnecessary and unusual noise which disturbs the peace and quiet of any residential area regardless of source, and Sec. 26-35 confirms nothing in that article overrides § 24.10's construction-related standards. A sheriff's deputy responding to a complaint can still act under Chapter 26 even where the zoning ordinance's performance standards don't apply.

Violations & Fines

Grinding or recycling construction debris outside the 7:00 a.m. to 7:00 p.m. window, or past the 60-day completion deadline, is a zoning violation subject to the county's general penalty under Ord. No. 98-1, § 2: Magistrate's Court prosecution with each day a separate offense. A sheriff's deputy can separately cite excessive construction noise as a public disturbance under Chapter 26, Article II regardless of the zoning exemption.

Frequently Asked Questions

Can contractors run equipment at night in Lexington County?
General construction, grading, and demolition noise is exempt from the zoning ordinance's decibel limits under § 24.14.d, so there's no ordinance-wide curfew on saws or generators. The one hard clock in the code applies narrowly to on-site grinding or recycling of construction debris, which § 21.21.i limits to 7:00 a.m. to 7:00 p.m.
Is there a limit on how long a construction site can grind debris on-site?
Yes. Section 21.21.i requires on-site grinding and recycling of construction debris to wrap up within 60 days of the start of construction, in addition to the 7:00 a.m. to 7:00 p.m. daily window. Public road construction projects are exempt from both limits.
What if a neighbor complains about construction noise that isn't debris grinding?
The general nuisance-noise ban in Chapter 26, Article II, which bars loud, unnecessary and unusual noise disturbing a residential area, still applies and is enforced by the sheriff's deputies. Section 26-35 confirms that article isn't overridden just because the zoning ordinance exempts construction noise from its own decibel standards.

Sources & Official References

Other rules in Lexington County

All Lexington County rules

How Lexington County compares: Cities with the Strictest Construction Hours·Compare Lexington County to another location·View the South Carolina noise ordinances overview

Get notified when Construction Hours in Lexington County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.