Skip to main content
CityRuleLookup

Methuen, MA Noise Ordinances: Decibel Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Ground-mounted equipment
50 decibels at the property line
Roof or side-mounted equipment
50 decibels at ground level at nearest building base
Study authority
Community Development Board, acoustical engineer at applicant's cost
Follow-up reports
Within 90 days of permit issuance, then annually
Wind facilities
No more than 10 dB(A) above ambient
Penalty
$300 per offense, each day separate

Summary

In the City of Methuen, Massachusetts, § 11.20(E)(4) caps noise from personal wireless service facilities at 50 decibels: ground-mounted equipment at the property line, and roof-mounted or side-mounted equipment at ground level at the base of the building closest to the antenna. The Community Development Board can commission an acoustical engineer at the applicant's cost.

E. Environmental standards. ... (4) Noise. (a) Ground-mounted equipment for personal wireless service facilities shall not generate noise in excess of 50 decibels at the property line. (b) Roof-mounted or side-mounted equipment for personal wireless service facilities shall not generate noise in excess of 50 decibels at ground level at the base of the building closest to the antenna. (c) The Community Development Board retains the right to commission an acoustical engineer to study noise at a proposed site in accordance with the standards in this Subsection E(4). The cost for retaining such an engineer shall be borne by the applicant.

Full Breakdown

The numeric decibel figures in the Methuen Comprehensive Zoning Ordinance attach to facility types and measurement points rather than to zones or hours of the day. The wireless rule sits in § 11.20, Personal wireless service facilities, added in 1999 by Ord. No. 665, under Subsection E, Environmental standards. Ground-mounted equipment shall not generate noise in excess of 50 decibels at the property line. Roof-mounted or side-mounted equipment shall not generate noise in excess of 50 decibels at ground level at the base of the building closest to the antenna. The Community Development Board retains the right to commission an acoustical engineer to study noise at a proposed site, and the applicant bears the cost.

The application must carry a noise statement listing existing and maximum future projected noise measurements in decibels Ldn, a logarithmic scale accounting for greater sensitivity at night. The statement covers the existing or ambient noise and the existing noise plus the proposed facility, and it must be certified and signed by an acoustical engineer. After the facility is operational, the applicant submits engineer-signed noise measurements within 90 days of the issuance of the special permit and at annual intervals from the date of issuance.

Wind energy conversion facilities have a separate standard in § 11.9(G)(3). They must conform with the Department of Environmental Protection noise regulations at 310 CMR 7.10 unless the Department and the special permit granting authority agree otherwise. A source violates the standard if it increases the broadband sound level by more than 10 dB(A) above ambient, or produces a pure tone condition when an octave band center frequency sound pressure level exceeds the two adjacent levels by three decibels or more. Ambient is the background A-weighted sound level exceeded 90% of the time during equipment hours, and compliance is measured at the property line and at the nearest inhabited residence.

Violations & Fines

A wireless facility that exceeds the 50 decibel standard violates its special permit conditions and the Zoning Ordinance. The penalty is $300 for each offense, and each day or portion of a day a violation continues is a separate offense (§ 10.2(E), § 10.7). The Building Commissioner serves a notice of violation and order and files an action at law or in equity to restrain, correct or abate the violation.

Frequently Asked Questions

What is the decibel limit for wireless equipment in Methuen?
Fifty decibels. Ground-mounted equipment cannot generate noise above 50 decibels at the property line, and roof-mounted or side-mounted equipment cannot exceed 50 decibels at ground level at the base of the building closest to the antenna. The limits are in § 11.20(E)(4)(a) and (b).
Who tests the noise and who pays?
The Community Development Board can commission an acoustical engineer to study noise at a proposed site, and the applicant bears the cost. Applicants file noise statements in decibels Ldn signed by an acoustical engineer, and after the facility operates they submit measurements within 90 days of the special permit's issuance and at annual intervals.
What is the noise limit for wind turbines in Methuen?
Section 11.9 requires conformance with DEP noise regulations at 310 CMR 7.10. A source violates them if it increases the broadband sound level by more than 10 dB(A) above ambient, or produces a pure tone condition of three decibels or more over adjacent frequency bands. The criteria are measured at the property line and the nearest inhabited residence.
Does the zoning ordinance set decibel limits by zone or time of day?
No such table is printed. The Comprehensive Zoning Ordinance puts its numeric decibel figures in the wireless facility section (§ 11.20) and the wind energy section (§ 11.9). Neither one varies by zoning district or hour of day, so the facility type and measurement point decide which number applies.

Sources & Official References

Other rules in Methuen

All Methuen rules

Compare Methuen to another location·View the Massachusetts noise ordinances overview

Get notified when Decibel Limits in Methuen, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.