Skip to main content
CityRuleLookup

Everett, MA Parking Rules: Driveway Rules (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit required
Any driveway construction, extension or alteration (Section 17-116(a))
Front yard
No parking within the front yard setback
Fees
$90 residential, $150 commercial, not refundable
Permit validity
120 days, renewable free by written request
Apron width
At least 9 feet at the street lot line
City decision
Mailed within 30 business days of submission

Summary

In the City of Everett, Massachusetts, no one can build, extend or alter a driveway without a driveway permit under Section 17-116, and the ordinance bans parking within the front yard setback. Any expansion of paved area has to be pervious, and the driveway apron cannot be narrower than 9 feet at the street lot line.

(a) No construction activity on driveways shall begin without a driveway permit. This applies to any and all driveway work. ... (c) All work on driveways shall be subject to the regulations of the city’s zoning ordinance, including the landscape requirements. ... (o) There shall be no parking within the front yard setback. (p) There shall be no impervious materials used within the front yard setback with the exception of walkways (walkway maximum width 4 feet) and driveway entrances. (q) All existing impervious areas may remain impervious but any expansion of the impervious area must be a pervious surface. A pervious surface shall not include crushed stone, dirt, gravel, or other similar material. (r) No driveway entrance and connecting sidewalk opening (the driveway apron) measured at the street lot line may not be less than 9 feet wide. (s) Any driveway flare out shall be set back 10 feet from the street lot line and shall not exceed 9 feet in width, with a minimum of 8 feet from all habitable windows on the basement and first floor of a building.

Full Breakdown

Driveway work in the City of Everett, Middlesex County, Massachusetts, runs through Chapter 17 of the Revised Ordinances. Section 17-116(a) says no construction activity on driveways begins without a driveway permit, and that covers any and all driveway work. For residential driveways, subsection (b) puts the duty to secure the permit on the property owner and the paving contractor together. Even an extension or alteration that never touches the public right-of-way, sidewalk, street or curbs needs the permit, so the city can confirm the project fits zoning and the Massachusetts stormwater standards. Resurfacing is carved out in subsection (h).

The front yard rules are the part that catches homeowners. Subsection (o) bars parking within the front yard setback. Subsection (p) bars impervious materials in the front yard setback except walkways, which top out at 4 feet wide, and driveway entrances. Existing impervious areas can stay as they are, but under subsection (q) any expansion has to be a pervious surface, and crushed stone, dirt, gravel or similar material does not count as pervious.

The geometry is fixed too. The driveway apron, measured at the street lot line, cannot be less than 9 feet wide. A flare out sits 10 feet back from the street lot line, stays within 9 feet in width and keeps a minimum of 8 feet from habitable windows on the basement and first floor. Subsection (n) sets 2 1/2 feet in height within 5 feet of the front lot line as the sight-line limit for fences, hedges, walls and signs unless the owner shows visibility for a car entering from the driveway is not restricted. Where a driveway crosses wetlands or the wetlands buffer zone, subsection (m) requires conservation commission approval before the permit application is filed.

The permit process sits in Sections 17-112 and 17-113. Applications are picked up at the building department, the city mails its decision no later than 30 business days after submission, and a permit is valid for 120 days from issue. Fees are $90 for residential and $150 for commercial driveways, and they are not refundable.

Violations & Fines

Starting driveway work without a permit brings an order under Section 17-116(g) to remove and restore the driveway and any altered property to its original condition. Paving contractors who fail to secure a permit before construction face penalty plus removal and restoration of the constructed area under subsection (b). The commissioner can suspend a permit under Section 17-112(l), with 30 days to fix noncompliant work before revocation. Section 1-8 sets a penalty of up to $300 per offense, and each day a violation continues is a separate violation.

Frequently Asked Questions

Can I park a car in my front yard in Everett, Massachusetts?
No. Section 17-116(o) says there shall be no parking within the front yard setback, and the sentence has no exception for guests or short stays. Subsection (p) separately limits what can be paved there. Penalties follow Section 1-8, up to $300 per offense, and each day a violation continues counts as a separate violation.
Can I widen or extend my driveway with gravel or crushed stone?
No. Under Section 17-116(q), existing impervious areas can stay impervious, but any expansion of the impervious area must be a pervious surface, and the ordinance says a pervious surface does not include crushed stone, dirt, gravel or other similar material. Any extension or alteration also needs a driveway permit first under subsection (a), even when no work touches the public right-of-way.
Do I need a permit to resurface my driveway in Everett?
Section 17-116(h) says the driveway regulations do not apply to resurfacing. The chapter defines resurface as application of hottop, sealer, coating or other surface material on existing layer. Anything beyond that, such as extending, widening or otherwise altering the driveway, falls under Section 17-112(a), which bars changing an existing driveway without first obtaining a driveway permit.
What does an Everett driveway permit cost and how long is it valid?
Section 17-113 sets the application fee at $90 for residential driveways and $150 for commercial driveways, not refundable, with federal, state and municipal entities exempt from the fee but still required to apply. Under Section 17-112(n) the permit is valid for 120 days, and a written extension request filed before expiration renews it at no cost.
Who is responsible if a paving contractor starts work without a permit?
Section 17-116(b) puts the duty to secure the permit on both the property owner and the driveway-paving contractor for residential driveways. Contractors who fail to secure the permit before construction starts face penalty and removal and restoration of the constructed area, and subsection (g) requires an order to remove and restore any altered property to the original condition.

Sources & Official References

Other rules in Everett

All Everett rules

Compare Everett to another location·View the Massachusetts parking rules overview

Get notified when Driveway Rules in Everett, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Driveway Rules in Nearby Cities

How other cities in this county handle driveway rules.

Cambridge, MA
Some Restrictions
Somerville, MA
Some Restrictions