Under 150 feet
Must meet current township fire and safety standards
150 feet or longer
12 inch subbase, six inch aggregate base, 14 feet wide
Vertical clearance
13 feet and six inches for the entire length
Lateral crown
Minimum two percent, maximum seven percent
Passing lanes
20 feet wide, 60 feet long, for drives of 400 feet or more
Approval
Fire department design approval before the building permit

Summary

Fruitport Charter Township regulates every new residential driveway under Section 42-606. A driveway of 150 feet or more needs a 12 inch granular subbase, a six inch aggregate base course, 14 feet of width and 13 feet six inches of vertical clearance, and the township fire department must approve its design before a building permit issues. Shorter driveways must meet current township fire and safety standards.

(f) Standards for driveway construction. (1) Driveways which are less than 150 feet in length must meet all current township fire and safety standards. (2) Driveways which are 150 feet in length or longer must meet the following requirements. a. The driveways must have a subbase of granular material which is at least 12 inches in depth for their entire length. b. The driveways must have an aggregate base course of compacted gravel, crushed concrete, slag, or similar material which is at least six inches in depth for their entire length. c. The minimum width of both the subbase and the aggregate base course shall be at least 14 feet for the entire length of the driveways. d. The driveways shall have a vertical clearance of at least 13 feet and six inches for their entire length. ... (g) Building permits. No building permit shall be issued for any dwelling which has a driveway 150 feet in length or greater until the driveway design has been approved by the township fire department and the applicant has presented the township with a curb-cut permit issued by the road authority, or a letter from the road authority indicating that no such permit is required.

Full Breakdown

Division 4 of the zoning chapter, Section 42-606, sets the driveway rules for Fruitport Charter Township. It states its own purpose: safe passage and maneuverability of private passenger vehicles, service vehicles and emergency services vehicles to the primary residential dwelling in all seasons of the year, suitable materials for long-term use, protection against soil erosion and damage to the lakes, streams, wetlands and natural environment of the township, and driveway specifications that meet current township fire and safety standards.

The division applies to residential driveways constructed after its effective date. Driveways that existed before can continue as they previously did, but when an existing driveway is extended or expanded to a residential dwelling it must comply, and any extension counts as part of that driveway. A parcel served by a driveway must keep frontage along a private or public road right-of-way equal to the minimum lot width required for its zoning district. A storm water run-off management system is required as deemed necessary by the township engineer and/or the Muskegon County Drain Commissioner, and a driveway crossing a watercourse or wetlands must satisfy the township and any county or state agency with jurisdiction. The address must be permanently displayed on the dwelling and on any accompanying mailbox, with a permanent address placed where the driveway meets the road if the dwelling's address cannot be seen clearly from there, all at the landowner's cost.

Construction standards turn on length. A driveway under 150 feet must meet all current township fire and safety standards. At 150 feet or longer, the printed requirements include a subbase of granular material at least 12 inches deep, an aggregate base course of compacted gravel, crushed concrete, slag or similar material at least six inches deep, a width of at least 14 feet for both layers, vertical clearance of at least 13 feet and six inches, an aggregate base width plus an additional two feet on each side that is clear, passable and maintained, a lateral crown of at least two percent and no more than seven percent, and fire department review of turns and cul-de-sacs. Driveways at least 400 feet but less than 800 feet long need a passing lane at least 20 feet wide and 60 feet long; at 800 feet or longer, a passing lane every 400 feet.

Permits follow the same 150 foot trigger. No building permit issues for a dwelling with a driveway of that length until the township fire department approves the driveway design and the applicant presents a curb-cut permit from the road authority, defined as the Muskegon County Road Commission or the current agency in charge of the township's roads, or a letter saying no permit is required. No certificate of occupancy is granted until the fire department inspects and approves the driveway. Owners carry all maintenance and repair costs, and driveways are subject to periodic fire department inspection.

Violations & Fines

A driveway built or extended in violation of Section 42-606 is a violation of the zoning chapter, which Section 42-5 makes a municipal civil infraction with civil fines set in Section 2-183 and increased fines for repeat offenses. Each day counts as a separate offense, and the owner and any builder or contractor who assists are each liable. The permit gate backs this up: the township withholds the building permit and the certificate of occupancy until the fire department approves the driveway.

Frequently Asked Questions

Do existing driveways in Fruitport Charter Township have to be rebuilt?
No. Under Section 42-606(b), driveways that existed before the division took effect can continue to exist as they previously did. The trigger is change: when an existing driveway is extended or expanded to a residential dwelling, the extension is treated as part of that driveway and must be constructed to comply with the chapter's requirements.
What approvals does a long driveway need before building?
For a dwelling with a driveway of 150 feet or longer, no building permit issues until the township fire department has approved the driveway design and the applicant presents a curb-cut permit from the road authority, or a letter from it saying no such permit is required. The fire department must also inspect and approve the driveway before a certificate of occupancy is granted.
Does Section 42-606 limit parking on a front yard or unpaved surface?
No. The division governs how residential driveways are designed, built and maintained, and its text prints no rule on parking vehicles in a front yard or on an unpaved surface. Off-street parking regulation sits in a separate article beginning at Section 42-631, where the Planning Commission reviews the site development plan for parking areas.
Who pays to maintain a driveway?
The property owner served by the driveway pays all costs for maintenance and repair. Section 42-606(h) also requires every driveway to be continuously maintained so that it is readily accessible to and usable by emergency vehicles in all types of weather, and the township fire department can inspect driveways periodically to confirm that.

Sources & Official References

Other rules in Fruitport Charter Township

All Fruitport Charter Township rules

Compare Fruitport Charter Township to another location·View the Michigan parking rules overview

Get notified when Driveway Rules in Fruitport Charter Township, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.