Skip to main content
CityRuleLookup

Washington County, OR Parking Rules: EV Charging (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Parking credit
1:1 substitution for required spaces
ADA minimum
At least 1 space per lot
Signage cap
5 sq ft per space
Outdoor outlet height
24 to 48 inches
Governing provision
CDC § 413-3.6

Summary

Washington County's Community Development Code does not mandate electric vehicle charging spaces, but Section 413-3.6 sets installation standards for any that are provided, allowing them to count 1:1 toward required parking, requiring at least one ADA-compliant space, and capping outlet mounting height between 18 and 48 inches.

City-specific rules exist: Hillsboro has its own ev charging rules that differ from Washington County's county-level regulations. If you live in Hillsboro, check the city-specific page instead.

413-3.6 If provided, electric vehicle charging parking spaces, either public or private, shall comply with the following requirements: A. Electric vehicle charging parking spaces may substitute for required minimum off-street parking spaces of Section 413-6.1 at a 1:1 ratio. B. A minimum of one electric vehicle charging space shall be ADA compliant. C. Electric vehicle charging parking spaces shall be posted with signage not to exceed 5 square feet in size. D. Electric vehicle charging unit outlets and operable parts shall be no less than 18 inches off the ground if indoors and 24 inches off the ground if outdoors and no higher than 48 inches off the ground to ensure easy access.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Community Development Code: Supplement 2 | Code of Ordinances: Supplement 25).

Full Breakdown

6 governs electric vehicle charging parking spaces, either public or private, wherever a development chooses to provide them; the county does not require EV charging as a condition of a parking area, but once a project includes charging spaces they must meet four standards. 1 at a 1:1 ratio, so an EV charging stall counts as a regular required space rather than an add-on. Subsection B requires a minimum of one electric vehicle charging space to be ADA compliant, ensuring accessible charging is built into any installation rather than left optional.

Subsection C requires posted signage identifying each space, capped at not to exceed 5 square feet in size, keeping wayfinding compact rather than turning into an additional freestanding sign under Section 414. Subsection D sets physical placement limits for the charging hardware itself: electric vehicle charging unit outlets and operable parts shall be no less than 18 inches off the ground if indoors and 24 inches off the ground if outdoors and no higher than 48 inches off the ground to ensure easy access, a band designed to keep controls reachable while limiting exposure to water pooling or vehicle contact at grade. 5-foot minimum stall width and applicable aisle clearances as a standard space in the same lot.

Violations & Fines

Because EV charging spaces are optional rather than mandated, there is no separate penalty for omitting them; a development that installs charging spaces without ADA compliance, without the required signage cap, or with outlets mounted outside the 18-to-48-inch band will not clear the Type I parking area development permit required by Section 413-1 before the spaces can be used to satisfy minimum parking counts.

Frequently Asked Questions

Is Washington County required to make me install EV charging in a new parking lot?
No. Section 413-3.6 only regulates charging spaces if provided; the code does not mandate them, but any EV spaces a development installs must meet the section's ADA, signage and outlet-height standards.
Do EV charging spaces count toward my required parking total?
Yes. Section 413-3.6.A lets electric vehicle charging spaces substitute for required minimum off-street parking under Section 413-6.1 at a 1:1 ratio.
How high can an outdoor charging station's plug be mounted?
Section 413-3.6.D requires outdoor charging unit outlets and operable parts to sit no lower than 24 inches and no higher than 48 inches off the ground; indoor units have a lower 18-inch floor.

Sources & Official References

Other rules in Washington County

All Washington County rules

Compare Washington County to another location·View the Oregon parking rules overview

Get notified when EV Charging in Washington County, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Cities Across Washington County