Island County, WA Parking Rules: EV Charging (2026)
Key Facts
- EV stall cap
- 50% of non-handicap parking spaces
- Handicap spaces
- May host chargers, must stay open to all
- Fraction rounding
- Rounds down for charging-space counts
- Applies to
- Off-street parking in Freeland NMUGA
- Mandate
- None; EV charging is optional, only capped
Summary
Freeland developers can convert up to half of their non-handicapped parking spaces into electric-vehicle charging stalls under Island County Code Section 17.06.550.C.4. Charging equipment can also go in accessible spaces, but those stalls must stay open to any driver, not just electric-vehicle owners, and fractional space counts always round down.
4.Electric vehicle charging stations.a.Electric vehicle charging stations space(s) may be utilized in a maximum of fifty (50) percent of the non-handicapped vehicle parking spaces provided.b.Electric vehicle charging station space(s) may be utilized in handicapped spaces provided. Use of such spaces shall not be limited to electric vehicles.c.For maximum charging station calculations, where a fraction space is calculated, round down.
Full Breakdown
550 sets the parking and circulation standards for all off-street parking in the Freeland Non-Municipal Urban Growth Area, and subsection C covers required and maximum parking spaces. Q, and the Freeland-specific maximum is capped at 150 percent of that minimum or 12 spaces, whichever is greater, so a lot cannot be built oversized. a lets a project convert up to 50 percent of its non-handicapped spaces into electric-vehicle charging stalls. b separately allows charging equipment in handicapped spaces, but requires that use of those spaces not be restricted to electric vehicles only, preserving accessible parking for any permit holder.
c directs that when the 50 percent calculation produces a fraction, the county rounds down, slightly reducing the maximum allowed count rather than rounding up. The rule is permissive rather than mandatory: it does not require a development to install any EV charging, it only limits how much of a lot's parking supply can be converted if a developer chooses to add chargers, so ordinary parking remains available.
Violations & Fines
There is no separate penalty schedule for parking-lot design; the Planning Director verifies parking counts, including any EV allocation, when reviewing the required site plan under Section 17.06.550.B.1, and no building permit is issued until the approved parking plan, capped at 50 percent EV conversion under Section 17.06.550.C.4.a, is on file. General code-enforcement, complaint, and penalty procedures under Island County Code Titles 16 and 17 (17.06.030.A) apply to unauthorized changes made to an approved parking plan after occupancy.
Frequently Asked Questions
Can a Freeland business convert its whole parking lot to EV charging?
Can a handicap parking space also be an EV charging space in Freeland?
Does Island County require new Freeland developments to install EV charging?
Sources & Official References
Other rules in Island County
Compare Island County to another location·View the Washington parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.