Lake County, IL Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Scope
New construction, unincorporated county only
Trigger threshold
26+ parking spaces
Large-site rule
2% EVSE, 5% EV-Ready, 10% EV-Capable
Small-site rule (1-25 spaces)
1 charging station, 2 EV-Ready spaces
Penalty
Up to $500 per offense, weekly

Summary

New commercial and multifamily construction in unincorporated Lake County must install EV charging stations and wire EV-ready and EV-capable parking spaces under the county's amended building code.

City-specific rules exist: Waukegan has its own ev charging rules that differ from Lake County's county-level regulations. If you live in Waukegan, check the city-specific page instead.

3115.1 Electric vehicle parking. Where parking is provided, new construction shall provide EVSE-installed spaces and facilitate future installation and use of EVSE through the provision of EV-Ready Spaces and EV-Capable Spaces provided in compliance with Sections 3115.1.1 through 3115.1.3, Where more than one parking facility is provided on a site, EVSE-installed, EV-Ready Spaces and EV-Capable Spaces shall be calculated separately for each parking facility.

Source: Justia - 765 ILCS 1085 Electric Vehicle Charging Act (Illinois)View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-15: Supplement contains: Local legislation current through Ord. 26-0618, passed 6-9-2026 | State legislation current through ILCS Pamphlet 2025 #5).

Full Breakdown

Lake County's 2024 building code amendments add IBC Section 3115 to require new commercial and multifamily buildings in unincorporated Lake County to provide electric vehicle charging infrastructure whenever parking is provided. Buildings with 26 or more parking spaces must equip at least 2% of spaces with an installed EV charging station, wire 5% more as EV-Ready spaces, and rough in 10% as EV-Capable spaces; smaller lots need at least one dual-port charging station plus two EV-Ready spaces. The Planning, Building & Development Department enforces this under § 150.16, and it applies only in unincorporated areas, not in Waukegan, Highland Park, Gurnee or the county's many incorporated cities and villages, which have their own codes.

Violations & Fines

Violating the EV charging installation requirement is a building code violation punishable by a fine up to $500 per offense, with each week of continued noncompliance a separate offense.

Frequently Asked Questions

Does this apply inside Waukegan or Highland Park?
No. Lake County's EV charging rule applies only to unincorporated Lake County; Waukegan, Highland Park, Gurnee and other incorporated municipalities enforce their own building codes.
Does an existing building have to retrofit for EV charging?
No. Section 3115 applies to new construction, new commercial and multifamily buildings, not to existing buildings absent a qualifying addition or renovation.
What must a 30-space new multifamily lot provide?
Under Table 3115.2, at least 5% of spaces (minimum 2) must be EV-Ready, 10% EV-Capable, and roughly 2% equipped with an installed charging station.

Sources & Official References

Other rules in Lake County

All Lake County rules

Compare Lake County to another location·View the Illinois parking rules overview

Get notified when EV Charging in Lake County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Cities Across Lake County