Skip to main content

Waukegan, IL Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

New homes
1 EV-ready space per dwelling unit
76+ parking spaces
25 total EV spaces required
Charging device height
36 to 48 inches above pavement
Permit needed
Building Permit in every district
ADA pairing
1 EV-installed space near ADA space (non-residential)

Summary

New single-unit and two-unit dwellings built in Waukegan must include at least one EV-ready parking space per dwelling unit, and larger developments must scale up EV-capable, EV-ready, and EV-installed spaces on a sliding table tied to total parking supplied, under UDO Section 10.10.

B.Number of Spaces Required. The minimum parking requirements for EV-capable, EV-ready, and EV-installed spaces are included in the total number of allotted parking spaces established in Table 10.03-1 Off-Street Parking Standards.1.Residential Uses. New construction of single-unit and two-unit dwellings must have at least one EV-ready parking space per dwelling unit. All other residential uses must provide EV charging infrastructure in accordance with Table 10.10-1 EV Minimum Parking Standards.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 113).

Full Breakdown

Section 10.10.B.1 requires new construction of single-unit and two-unit dwellings to provide "at least one EV-ready parking space per dwelling unit." All other residential uses, and every non-residential use under Section 10.10.B.2, must instead meet Table 10.10-1 EV Minimum Parking Standards, which scales requirements to the total parking spaces provided: a site with 1 to 10 spaces needs 1 EV-capable space; 11 to 20 spaces needs 2 EV-capable and 1 EV-ready space; 21 to 30 needs 3 EV-capable and 2 EV-ready; 31 to 75 needs 5 EV-capable, 3 EV-ready, and 2 EV-installed; and 76 or more spaces needs 10 EV-capable, 10 EV-ready, and 5 EV-installed, for 25 total EV spaces.

Section 10.10.B.3 lets EV-installed spaces substitute for EV-ready or EV-capable spaces toward the cumulative total. Design standards in Section 10.10.D require charging equipment to mount on a wall or end-of-space structure, never inside the parking space dimensions; outlets and connectors must sit between 36 and 48 inches above pavement; cords must retract or hang clear of the pavement to prevent entanglement; and any wayfinding signage must comply with Section 12.06. Section 10.10.E requires non-residential sites to place at least one EV-installed space adjacent to an ADA-designated space. The accessory use table separately lists Electric Vehicle Charging Station as requiring a Building Permit in every zoning district under Section 9.03.C.15.

Violations & Fines

Completing new residential construction without the required EV-ready space per dwelling unit, or a commercial development without the EV-capable, EV-ready, or EV-installed spaces its parking count requires under Table 10.10-1, is a zoning code violation the City can cite at occupancy certificate review, since Section 11.01.C ties occupancy certificates to compliance with the site's approved standards.

Frequently Asked Questions

Does a new house in Waukegan need an EV charging spot?
Yes. Section 10.10.B.1 requires new construction of single-unit and two-unit dwellings to provide at least one EV-ready parking space per dwelling unit, separate from the scaled EV-capable/EV-ready/EV-installed table that governs other residential and non-residential parking lots.
How many EV spaces does a Waukegan business with 50 parking spots need?
Table 10.10-1 places a 31-to-75-space lot in the band requiring 5 EV-capable spaces, 3 EV-ready spaces, and 2 EV-installed spaces, for 10 total EV spaces, and Section 10.10.B.3 allows EV-installed spaces to count toward the EV-ready and EV-capable totals.
Do I need a permit to install an EV charger in Waukegan?
Yes. Table 9.03-1 lists Electric Vehicle Charging Station with a "BP" designation in every zoning district in the city, meaning a building permit under Chapter 6 is required, and Section 9.03.C.15.b requires the installation to meet the design standards in Section 10.10.

Sources & Official References

Other rules in Waukegan

All Waukegan rules

Compare Waukegan to another location·View the Illinois parking rules overview

Get notified when EV Charging in Waukegan, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.