Maui County, HI Parking Rules: EV Charging (2026)
Key Facts
- Residential EV-capable share
- 70% (8+ new stalls)
- Residential charger-ready share
- 20% minimum
- Commercial EV-capable share
- 40% (10+ new stalls)
- Fast-charger substitution
- 1 DC fast (20 kW) per 7 Level 2 spaces
- Low-income exemption
- 100% AMI or below: fully exempt
- Adopting ordinance
- Ord. No. 5455, §§ 2-3 (2022)
Summary
New multiunit and commercial buildings on Maui must build a share of their parking EV-ready. Residential projects adding eight or more stalls need 70 percent electric-vehicle-capable, and commercial projects adding ten or more stalls need 40 percent capable, under the county's Energy Code.
C406.10 Electric vehicle infrastructure. All newly created parking stalls for newly constructed residential multiunit and commercial buildings must comply with one of the electric vehicle readiness compliance pathways specified in subsection C406.10.1. ... C406.10.1. Baseline percentage electric vehicle readiness compliance path. ... 1. Newly constructed parking stalls for newly constructed residential multi-unit buildings that add eight or more new parking stalls must ensure 70 percent of all newly added parking stalls are electrical vehicle capable. At least 20 percent of the newly added parking stalls must be electric vehicle charger ready, and at least 10 percent must have electrical vehicle chargers in place and operational.
Full Breakdown
1. For residential multiunit projects adding eight or more new stalls, seventy percent of the added stalls must be "electric vehicle capable," at least twenty percent must be "electric vehicle charger ready," and at least ten percent must have chargers actually installed and operational. Commercial projects adding ten or more new stalls must make forty percent of the new stalls capable, with at least ten percent carrying operational chargers. Alterations trigger the same requirements when the work area exceeds fifty percent of the original building area or more than ten parking spaces are substantially modified.
The code defines "electric vehicle charger ready" as having the wire, conduit, panel capacity, overcurrent protection, and termination points needed for a Level 2 charging station, while "electric vehicle capable" means only the conduit is in place. Exceptions soften the mandate: multi-use and commercial projects can substitute one 20-kilowatt DC fast-charging space for up to seven Level 2 spaces; retail establishments get a twenty percent reduction in required stalls; affordable units for households between 100 and 140 percent of area median income get a fifty percent reduction; and units for households at or below 100 percent of area median income are exempt entirely. The requirement was added by Ordinance No. 5455 in 2022 as part of the county's adoption of the Hawaiʻi State Energy Code.
Violations & Fines
Compliance is checked by the Department of Public Works at building permit plan review and construction inspection, since the Energy Code amendments are part of the permitted construction documents for new residential multiunit and commercial buildings. A project that does not document one of the Section C406.10.1 compliance pathways cannot receive a permit or pass inspection for the affected parking areas, and, as with other Title 16 construction code violations, an uncorrected deficiency exposes the owner to the county's general penalty of up to $100 per offense under Section 1.12.010 where no separate fine is specified.
Frequently Asked Questions
Does a new Maui condo project need EV charging infrastructure?
Are affordable housing projects exempt from the EV parking rule?
Can a developer install fast chargers instead of standard Level 2 stalls?
What is the difference between "EV capable" and "EV charger ready" stalls?
Sources & Official References
Other rules in Maui County
Compare Maui County to another location·View the Hawaii parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.