Skip to main content
CityRuleLookup

Thurston County, WA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing rule
TCC § 21.55.030: allowed in every zone
Residential retrofit
Electrical permit only
Commercial retrofit
County Site Plan Review required
Minimum stalls
None: optional improvement
Battery exchange stations
Barred in residential, critical-area zones

Summary

Thurston County allows electric vehicle charging stations as an accessory use in every zoning district, from single-family garages to commercial parking lots near Interstate 5.

These county ordinances apply to unincorporated areas of Thurston County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A.Allowed Where. "Electric vehicle charging stations" shall be considered an allowed use in association with a primary permitted use in every zoning designation. B.Compatibility. For land use compatibility purposes, the charging activity should be proportionate to the associated permitted use; "Electric vehicle charging station(s)" shall be permitted in a single-family garage designed to serve the occupants of the home with a level 1 or 2 charging level.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 77).

Full Breakdown

Thurston County Code § 21.55.030 makes electric vehicle charging stations an allowed use alongside any primary permitted use in every zoning designation: residential, commercial, or industrial. New residential construction bundles the charging station into the underlying building permit, while retrofitting a single-family home for a charging station triggers only an electrical permit under TCC § 21.55.035. Commercial retrofits go through Site Plan Review. Design standards in § 21.55.040 call for signage identifying the stalls, wayfinding signs at lot entrances, adequate lighting, and disclosure of voltage, amperage, and fees at the station. Battery exchange stations are barred from residential and critical-area zones.

Violations & Fines

Installing a charging station without the electrical permit required for single-family retrofits, or without Site Plan Review for commercial retrofits, violates Thurston County's zoning and building codes and can halt the project or trigger corrective orders.

Frequently Asked Questions

Can I install an EV charging station at my Thurston County home?
Yes. New construction includes it in the building permit; retrofitting an existing single-family home for a charging station only requires an electrical permit under TCC § 21.55.035.
Does Thurston County require a minimum number of EV stalls at commercial sites?
No. TCC § 21.55.040 treats EV charging as an optional improvement with no minimum stall count, though sites reserving stalls must still meet overall parking needs.

Sources & Official References

Other rules in Thurston County

All Thurston County rules

Compare Thurston County to another location·View the Washington parking rules overview

Get notified when EV Charging in Thurston County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.