Harnett County, NC Parking Rules: Loading Zones (2026)
Key Facts
- Minimum berth width
- 12 feet
- Minimum berth length
- 55 feet
- Minimum height clearance
- 15 feet
- Retail/service berth ratio
- 1 per 20,000 sq ft
- Industrial berth ratio
- 1 per 10,000 sq ft (first 30,000)
- Waiver authority
- Board of Adjustment
Summary
Businesses in unincorporated Harnett County must load and unload entirely on their own property, in a permanent loading berth at least 12 feet wide, 55 feet long, and with 15 feet of height clearance. Section 153.152(B) also sets a minimum number of berths by building size and use type.
(B) Off-street loading requirements. (1) All uses and establishments commenced hereafter shall provide off-street loading spaces sufficient to allow all loading and unloading of vehicles to take place entirely within the property lines of the premises. (2) The off-street loading space provided as required by this section shall be permanent space and shall not be used for any other purpose. (3) A loading space requirement may be waived by the Board of Adjustment on application due to a limited need for loading space based on the nature of the building. (4) Loading berths shall be designed... so as not to interfere with the free, normal movement of vehicles and pedestrians on public right(s)-of-way and shall have the following dimensions: (a) Minimum width of 12 feet; (b) Minimum length of 55 feet; and (c) Minimum height clearance of 15 feet.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-7: Supplement contains: Local legislation current through 11-18-2024; and State Legislation current through 2024 Legislative Service #2).
Full Breakdown
152(B) is the county's off-street loading standard for every use and establishment built after the ordinance's adoption. It requires enough off-street loading space to allow all loading and unloading of vehicles to happen entirely within the property lines of the premises, so trucks cannot block a public street or right-of-way to make a delivery. That space must be permanent and cannot be used for any other purpose, meaning a business cannot double it as customer parking. The Board of Adjustment can waive the loading-space requirement on application if the nature of the building creates only a limited need for loading.
Each required loading berth must be designed, along with its ingress and egress, so it does not interfere with the free, normal movement of vehicles and pedestrians on the public right-of-way, and it must meet minimum dimensions of 12 feet in width, 55 feet in length, and 15 feet of vertical clearance. The minimum number of berths scales with use and floor area: retail and service establishments need one berth per 20,000 square feet of gross floor area, with two or more adjoining smaller establishments treated as one for this purpose; office buildings, hotels, and institutional uses need one berth per 50,000 square feet; and industrial and wholesale establishments need one berth per 10,000 square feet up to the first 30,000 square feet of floor area, then one additional berth per 30,000 square feet beyond that.
Violations & Fines
Building or operating without the loading berths required by section 153.152(B), or using a required loading space for another purpose, is a zoning violation enforced under section 153.999: the Planning Department can issue a civil citation carrying a $100-per-day penalty until compliance, up to a $500 maximum civil penalty per violation, with unpaid penalties collectible as a civil debt.
Frequently Asked Questions
How big does a loading space have to be in Harnett County?
Can a business use its loading space for extra parking in Harnett County?
How many loading berths does a retail store need in Harnett County?
Can the loading space requirement be waived?
Sources & Official References
Other rules in Harnett County
Compare Harnett County to another location·View the North Carolina parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.