Acworth, GA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit issuer
- City manager or designee
- Approval required from
- Public works/power director
- Permit term
- 1 year, auto-renews
- Pole height cap
- 48 feet in residential areas
- Restoration deadline
- 20 working days after notice
- Unstarted work expires after
- 6 months
Summary
Acworth requires anyone placing a pole, wire, cable or conduit in a city street right-of-way to obtain a right-of-way encroachment permit from the city manager's office before starting work. The permit is issued in duplicate, its fee is set by the city's schedule of fees and charges, and it automatically renews each year unless the permittee defaults.
It shall be unlawful for any person, except a franchisee, to place a pole, telephone or telegraph wire, cable or conduit upon, under, above or in the right-of-way of a city street without first having obtained from the city manager or designee, a permit to do so. ... The fee for a permit under this division shall be as fixed by the mayor and board of aldermen as set forth in the schedule of fees and charges on file with the office of the city clerk. ... The right-of-way encroachment permit ... shall remain in place for one year and renew each subsequent year automatically unless the utility is in default.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).
Full Breakdown
Under Acworth Code of Ordinances § 82-71, it is unlawful for anyone except a franchisee to place a pole, telephone or telegraph wire, cable or conduit upon, under, above or in a city street right-of-way without first getting a permit from the city manager or a designee. The application must be approved by the public works/power director and issued in duplicate, specifying the street, the purpose of the installation, the type and length of wire or conduit, the extent of construction and the time allowed to finish the work.
The permit fee is set separately under § 82-72, tied to the fee schedule kept on file with the city clerk rather than a fixed dollar figure in the code itself. Section 82-73 layers on conditions: the permittee must hold the city harmless for property damage or injury from the installation, follow the state DOT's 2009 Utility Accommodation Policy and Standards Manual, and cap any new pole height at 48 feet in residential areas, with no stand-alone monopoles allowed. Section 82-74 makes the permittee responsible for restoring any street or right-of-way it disturbs, and if repairs are not started within 20 working days of written notice, the city or property owner can do the work and bill the utility.
Under § 82-76, the permit runs for one year and renews automatically each year unless the director finds the holder in default (violating permit terms, evading the article, committing fraud, misrepresenting facts, or missing a fee payment); the utility then gets 20 working days to cure, and if it fails, 15 more calendar days after written notice of intended termination before the permit is declared terminated. A permit not started within six months of issuance expires automatically.
Violations & Fines
Failing to comply with the permit's terms can lead to revocation of the encroachment permit and an order to remove the installed facilities from the right-of-way under § 82-73. Section 82-77 treats unauthorized use or placement in the right-of-way, and any continuing failure to comply, as a separate offense for each day it continues.
Frequently Asked Questions
Who issues Acworth's right-of-way encroachment permit?
How long does an Acworth encroachment permit last?
What happens if I do not fix the street after installing my utility line?
Can Acworth revoke my encroachment permit?
Sources & Official References
Other rules in Acworth
Compare Acworth to another location·View the Georgia sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.