Skip to main content
CityRuleLookup

Green Bay, WI Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Issuing authority
Director of Public Works
Insurance & bond
Certificate of insurance plus bond required
Approval timeline
Deemed granted after 30 days
Penalty
Forfeiture up to $1,000 per day
Sidewalk work exemption
Sidewalk construction/replacement excluded from this permit

Summary

Digging up the curb strip, running a utility line, or connecting a service pipe under a Green Bay street or sidewalk requires an excavation permit from the Director of Public Works, backed by insurance and a bond.

No cut, excavation, or service connection shall be made in any right-of-way unless a permit therefor is obtained from the Director. The provisions of this section shall not apply to the construction or replacement of public sidewalks.

Full Breakdown

Section 34-5 requires anyone cutting, excavating, or connecting a service line within the public right-of-way, the street, alley, sidewalk, or bike lane, to first obtain a permit from the Director of Public Works. Applicants must file a certificate of liability insurance and a cash or performance bond with the City Clerk before work begins, and pay a permit fee covering the City's inspection costs. The Director must act on an application within 30 days or it's deemed granted. Sidewalk construction and replacement itself is exempt from this permit, that's covered separately under Section 34-7.

Violations & Fines

Excavating or occupying the right-of-way without a permit, or violating permit conditions, carries a forfeiture of up to $1,000, with each day of continued violation treated as a separate offense.

Frequently Asked Questions

Do I need a permit to dig up the parkway strip in front of my house in Green Bay?
Yes. Section 34-5(b)(1) requires an excavation permit from the Director of Public Works before any cut, excavation, or service connection in the right-of-way, except sidewalk construction or replacement.
What does a Green Bay excavation permit application require?
A completed application, a certificate of liability insurance, and a cash or performance bond filed with the City Clerk before the permit issues.

Sources & Official References

Other rules in Green Bay

All Green Bay rules

Compare Green Bay to another location·View the Wisconsin sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Green Bay, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Nearby Cities

How other cities in Brown County handle encroachment permits.

De Pere, WI
Some Restrictions
Ashwaubenon, WI
Significant Restrictions