Haverford, PA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit required for
- Opening a street or placing material or debris in it
- Where to apply
- Township Secretary, on the Board's form
- Bond
- Equal to street restoration cost, unless waived
- Insurance minimum
- $500,000 per occurrence, liability and personal injury
- Work hours
- 7:00 a.m. to 8:00 p.m. under § 157-29
- Start deadline
- Within 30 days of the permit date
- Maximum fine
- $600 plus costs; up to 30 days jail
Summary
In Haverford Township, Delaware County, Pennsylvania, no one can open or excavate a street, or place construction material or debris in it, without a permit from the Township. Applicants file with the Township Secretary, post a restoration bond unless waived, carry $500,000 liability coverage, and answer to the Township Engineer and Department of Public Works.
A. No portion of any street shall be opened or excavated by any person for the purpose of laying pipes, sewers, drains or conduits of any description or for making connections therewith or repairs thereto or for the setting or planting of telegraph, telephone, electric light or other poles on or along said streets, or for repairs thereto or renewals thereof or for any and all other purposes without first obtaining a permit. A permit is also required whenever any construction material or debris is to be placed in the street. ... C. The Township may impose reasonable conditions upon the issuance of a permit in order to protect the public, health, safety, and well-being, to insure the structural integrity of the streets, to protect the property and safety of other users of the streets, and to minimize the disruption and inconvenience to the traveling public.
Full Breakdown
Chapter 157, Article III of the Haverford Township Code governs excavations, openings and occupancy of the public right-of-way. Section 157-21 defines STREET to include the entire right-of-way of a public street, highway, alley, way, road or public easement within the Township, so the permit reaches past the pavement. Under § 157-22, a permit is required to open or excavate a street for pipes, sewers, drains, conduits or poles, and also whenever any construction material or debris is to be placed in the street. The Township can attach reasonable conditions to protect public safety, the structural integrity of the streets and other users, and to minimize disruption to the traveling public. No permit issues to an applicant who still owes the Township money for earlier excavations or damage.
Section 157-23 requires a written application on the Board of Commissioners' form, filed with the Township Secretary, listing the applicant's name and address, the purpose and a narrative of the work, the time and location, a drawing of the site, and anything else the Township Engineer requires. The applicant assumes all liability for damages and agrees to indemnify the Township. Section 157-24 requires a bond equal to the cost of restoration, posted as cash, letter of credit or performance bond, and insurance from A-rated companies with $500,000 for each occurrence for comprehensive liability and $500,000 per occurrence for personal injury. Both are waived where a resident owner personally repairs a driveway, driveway apron, curb or sidewalk, or where a Township franchisee's agreement provides the guarantees.
Section 157-25 splits the fee into an application fee, street degradation fee, pole fee, occupancy fee and traffic management fee, all set on the Township Schedule of Fees. The Township Engineer must approve any tunnel or any break in a cement-concrete road, and must consent in writing before a permit area is closed to traffic (§ 157-26). Permittees furnish flags, barricades and amber lights lit from sunset to sunrise (§ 157-27), give owners at least five days' written notice for excavation on a lawn area, and must start within 30 days of issuance (§ 157-28). Work runs from 7:00 a.m. to 8:00 p.m. under § 157-29. A permit confers no permanent right to keep a structure in place: § 157-31 lets the Engineer require relocation, and the Department of Public Works can remove it at the permittee's cost. Emergency utility repairs may begin without a permit if the application and fee follow within 48 hours (§ 157-31.3).
Violations & Fines
Under § 157-31.2, a person who violates Article III is subject, on summary conviction before a District Justice, to a fine of not more than $600 plus costs of prosecution, and a violator who does not pay can be sentenced to county jail for not more than 30 days. Each day a violation occurs or continues is a separate violation. Under § 157-31, structures left in place after a relocation notice can be removed by Public Works at the permittee's expense.
Frequently Asked Questions
When do I need a street permit in Haverford Township?
What insurance does the Township require for a street opening permit?
Can I start work before the permit arrives in an emergency?
How long is a Haverford Township street permit good for?
Sources & Official References
Other rules in Haverford
Compare Haverford to another location·View the Pennsylvania sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.