Skip to main content
CityRuleLookup

Springdale, AR Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 110-86
Issued by
city public works director
Inspection fee
$50.00
Minimum bond
$5,000.00

Summary

Digging, boring, or removing any part of a Springdale street, curb, alley, or sidewalk requires a public works permit, a $50 inspection fee, and a surety bond of at least $5,000.

Before any person shall dig, excavate in, bore under or remove any portion of any city right-of-way, street, alley, curb or sidewalk in the city, he shall obtain a permit issued by the city public works director. At the time of making application for the permit, an inspection fee of $50.00 shall be paid. An applicant for such permit shall deposit a sufficient surety bond at the office of the city public works director before a permit shall be issued. The amount of the bond shall be determined by the public works director based upon the estimated cost of the permanent repair as described under subsection (2)d below, plus an amount sufficient to pay for any and all damages to public property that may result in the course of the permitted work, but shall not be less than $5,000.00. The bond shall be forfeited, all or in part thereof, for failure to comply with the rules of public safety, failure to close the opening within 24 hours after the work has been completed, failure to complete the backfill and repair in accordance with specifications, failure to complete the necessary cleanup, damage to public property including but not limited to the street subgrade, asphalt surface, concrete surface, curb and gutter, sidewalk, and/or all infrastructure located within the street right-of-way or causing unnecessary inconvenience or damage to vehicular or other traffic. The person working within the city street or right-of-way shall

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 145).

Full Breakdown

City Code § 110-86 requires anyone who will 'dig, excavate in, bore under or remove any portion of any city right-of-way, street, alley, curb or sidewalk' to first get a permit from the city public works director, pay a $50 inspection fee, and post a surety bond sized to the estimated repair cost but never less than $5,000. The bond is forfeited for missed cleanup, unrepaired damage, or leaving an opening unclosed more than 24 hours after work ends.

Violations & Fines

Working in the right-of-way without the § 110-86 permit is punishable under the general § 1-9 penalty (up to $1,000, doubled for repeats), plus forfeiture of the required bond.

Frequently Asked Questions

Do I need a permit to dig up a Springdale sidewalk or curb for utility work?
Yes. City Code § 110-86 requires a public works permit, a $50 inspection fee, and a surety bond before any digging, boring, or excavation in the city right-of-way.
How big does the bond need to be?
At least $5,000, or more if the public works director estimates a higher repair cost, per § 110-86.

Sources & Official References

Other rules in Springdale

All Springdale rules

Compare Springdale to another location·View the Arkansas sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Springdale, AR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.