El Paso, TX Sign Regulations: Freeway-Facing Signs (2026)
Key Facts
- I-10 maximum display face
- 672 square feet in C-3, C-4, M-1, M-2, M-3
- I-10 maximum height
- 60 feet, excluding cutouts above the border
- Other freeway-adjacent arterials
- 300 square feet, top of face within 35 feet of grade
- Static billboard residential setback
- 350 feet from property line
- CEVM billboard residential setback
- 500 feet from property line
- Billboard spacing
- 1,500 feet, same side of the street or road
- Construction deadline
- Six months, plus one six-month extension
Summary
On Interstate Highway 10 in El Paso, new static and new CEVM (digital) billboards in C-3, C-4, M-1, M-2 and M-3 zoning can have display faces up to 672 square feet and stand no higher than 60 feet. A new static billboard must sit 350 feet from residential property lines and a new CEVM billboard 500 feet.
In zoning districts C-3, C-4, M-1, M-2, and M-3 districts on Interstate Highway 10, new static and new-CEVM may have operational display faces up to six hundred seventy-two square feet in display area, with the new static or new-CEVM being no higher than sixty feet, excluding a cutout that extends above the rectangular border of the sign ... New static billboards must be at least 350 feet from the property line of any residential use or the following zoning districts: R-F, R-1, R-2, R-2A, R-3, R-3A, R-4, R-5, P-RI, P-RII, RMH, PMD, A-1, A-2, A-3, A-4, A-M, A-3/O, A-O, R-MU, G-MU, I-MU, or SmartCode Zone. ... New CEVM billboards must be at least 500 feet from the property line of any residential use or the following zoning districts: R-F, R-1, R-2, R-2A, R-3, R-3A, R-4, R-5, P-RI, P-RII, RMH, PMD, A-1, A-2, A-3, A-4, A-M, A-3/O, A-O, R-MU, G-MU, I-MU, or SmartCode Zone.
Full Breakdown
El Paso regulates billboards in Article III of Chapter 20.18, and the rules reach the whole city and its extraterritorial jurisdiction. Section 20.18.220(A) sets the freeway cap: in C-3, C-4, M-1, M-2 and M-3 districts on Interstate Highway 10, a new static or new CEVM billboard can carry display faces up to 672 square feet and stand no higher than 60 feet, not counting a cutout that rises above the rectangular border. Height is measured from the grade at the centerline of the main-traveled way closest to the sign, excluding a frontage road of a controlled access highway, or from the base of the sign structure if the main-traveled way is below grade. On major arterials, super arterials or higher arterials in the same districts, section 20.18.220(B) drops the limit to 300 square feet, with the top of the face no more than 35 feet above the grade of the freeway, expressway or interstate highway. Section 20.18.220(C) allows no more than eight bulletin billboards on Loop 375 from Interstate Highway 10 to Montana, spaced at least 6,000 feet apart.
Setbacks come from section 20.18.230. A new static billboard must be at least 350 feet from the property line of any residential use or any listed residential, apartment, mixed-use or SmartCode district, and a new CEVM billboard must be 500 feet away under subsection (B). The SmartCode exception covers only a sign abutting a SmartCode Zone where residential use is prohibited by law. Signs up to 72 square feet sit 35 feet from C-1 and C-5 property lines on the same side of the street, larger signs sit 50 feet from C-1 through C-5 lines, and no new billboard can stand within 35 feet of a freestanding on-premises sign on the same side of the street. Section 20.18.240 adds 1,500 feet of spacing between billboards on the same side of the road. Construction must finish within six months of permit issuance, with one six-month extension from the planning division under section 20.18.210.
Violations & Fines
A billboard that misses the Chapter 20.18 standards is not permitted, and a sign built without a permit that cannot be registered is subject to removal. The building official sends certified-mail notice giving ten days to remove it or cure the defect, publishes notice if the owner cannot be found, and refers the case to the building and standards commission under Chapter 2.38 after ten working days without a response. Permit decisions are appealed to the zoning board of adjustment, which must rule within 30 business days or the appeal is deemed denied.
Frequently Asked Questions
How large can a new billboard facing Interstate 10 in El Paso be?
How far must a digital billboard be from homes in El Paso?
Are there freeway interchanges in El Paso where new billboards are banned?
Does El Paso require old billboards to come down before a new one goes up?
What display rules apply to a digital freeway billboard in El Paso?
Sources & Official References
Other rules in El Paso
Texas rules heatmap·Compare El Paso to another location·View the Texas sign regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.