Auburn, AL Solar Energy: Panel Permits (2026)
Key Facts
- Permit required
- Zoning certificate before installation
- Residential ground-mount cap
- 17 square feet
- Systems per lot
- One ground-mounted system
- Setback
- Not forward of front building line
- Non-residential ground-mount
- Not permitted
- Non-residential roof-mount cap
- 2 feet above roofline
Summary
A solar array in Auburn is an accessory use and needs a zoning certificate before installation. Ground-mounted residential panels are capped at 17 square feet, one system per lot, and cannot sit forward of the front building line.
511.02. Zoning certificate required. No accessory use or structure shall be established or constructed unless a zoning certificate evidencing the compliance of such use or structure with the provisions of this Section and other applicable provision of this Ordinance shall have first been issued in accordance with Section 804. ... 511.07.C. Solar Energy Systems. 1. Solar Energy Systems shall not be the principal use of any property not zoned Industrial (I). 2. The following regulations shall also apply to solar energy systems: Single Family and Multi-Family Residential Uses a) Ground mounted solar panels shall not exceed 17 square feet in size. b) No more than one ground mounted solar energy system shall be placed on any one lot or parcel. c) Gound mounted solar energy systems shall not be located forward of the front building line or within a required setback/bufferyard area. d) Ground mounted solar energy systems shall not exceed a height equal to the distance from property lines OR height of any structures on property. e) Roof mounted solar energy systems shall not be placed on a roof pitched towards a public street.
Full Breakdown
02 of the Zoning Ordinance requires a zoning certificate for any accessory use or structure, including solar energy systems, before it can be established or constructed, issued under the general permit procedure in Section 804. C then sets the substantive limits: a solar energy system cannot be the principal use of any property unless that property is zoned Industrial (I). For single-family and multi-family residential lots, ground-mounted solar panels cannot exceed 17 square feet in size, and only one ground-mounted system is allowed per lot or parcel.
Ground-mounted systems cannot be placed forward of the front building line or inside a required setback or bufferyard, and their height cannot exceed the distance to the property line or the height of any structure already on the lot, whichever governs. Roof-mounted panels cannot go on a roof pitched toward a public street. Non-residential properties face tighter rules still: roof-mounted systems there are capped at two feet above the visible roofline, and ground-mounted solar is not permitted on non-residential lots at all, pushing commercial and institutional solar to roof-mount or Industrial-zoned ground installations only.
Anyone installing panels should confirm both the accessory-use permit and these dimensional limits with the Planning Department before ordering equipment, since the 17-square-foot residential ground-mount cap is small enough that most residential systems will need to be roof-mounted to be practical.
Violations & Fines
Installing a solar energy system without the required zoning certificate, or one that exceeds the size, setback, or height limits in Section 511.07.C, is a violation of the Zoning Ordinance under Section 909: a fine of up to $500, up to six months in jail, or both, plus court costs, with each day of continued violation a separate offense. Section 909.01 doubles all applicable fees for construction that began before the zoning certificate was obtained.
Frequently Asked Questions
Do I need a permit for solar panels in Auburn?
How big can a ground-mounted residential solar array be in Auburn?
Can a business install ground-mounted solar panels in Auburn?
Sources & Official References
Other rules in Auburn
Compare Auburn to another location·View the Alabama solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.