Key Facts

Residential ground-mount location
Rear yard only
Ground-mount height limit
15 feet at max tilt
Roof-mount height limit
District's max building height
Lot coverage limit
Half of principal building footprint
Abandonment threshold
1 year nonfunctional = nuisance
Permit fee basis
$4,000 valuation tier

Summary

In the City of Brooklyn Park, ground-mounted solar systems are limited to rear yards in residential districts, capped at 15 feet tall at maximum tilt, and must be screened and positioned to avoid glare, under City Code § 152.1002(D), on top of the city's standard building permit process.

(D) Solar energy. ... (1) Exemption. Passive or building-integrated solar systems are exempt from the requirements of this section and shall be regulated as any other building element. (2) Standards. (a) Location. 1. In residential zoning districts, ground-mounted solar energy systems are limited to the rear yard. ( ... b) Height. ... 1. Roof-mounted solar energy systems shall comply with the maximum height requirements in the applicable zoning district. 2. Ground mounted solar energy systems shall not exceed 15 feet in height when oriented at maximum tilt. ( ... e) Glare. ... All solar energy systems shall be positioned to minimize glare towards vehicular traffic and adjacent properties. ... (3) Abandonment. If a solar energy system remains nonfunctional or inoperative for a continuous period of one year, the system shall be deemed to be abandoned and shall constitute a public nuisance. The owner shall remove the abandoned system at their expense after a demolition permit has been obtained. Removal includes the entire structure including transmission equipment.

Full Breakdown

1002(D) sets the zoning standards for solar energy systems citywide. Passive or building-integrated solar systems are exempt and regulated like any other building element, but active roof- and ground-mounted systems must follow specific rules. 1001(B). Roof-mounted systems must stay within the applicable district's maximum building height, while ground-mounted systems cannot exceed 15 feet in height when tilted at their steepest angle. Systems must be screened from view where feasible without hurting performance, though roof-mounted systems that are not visible from the nearest public right-of-way, or that meet pitch and height thresholds (matching the roof pitch and rising no more than ten inches above a pitched roof, or no more than five feet above a flat roof), are exempt from further screening.

Ground-mounted systems cannot cover more than half the principal building's footprint and are exempt from lot coverage limits if the ground beneath stays vegetated and uncompacted. All systems must be positioned to minimize glare toward traffic and neighboring properties, and feeder lines must run underground within the parcel. A solar system left nonfunctional for a full year is deemed abandoned and a public nuisance, and the owner must remove it, including transmission equipment, after obtaining a demolition permit. 01, administered by the city's Certified Building Official, with the city's fee schedule pricing a solar panel permit on a $4,000 valuation basis.

Violations & Fines

Installing a ground-mounted system that exceeds 15 feet, sits outside the rear yard in a residential district, or is left abandoned for over a year violates § 152.1002(D) and is enforced by Community Development; working without the required building permit under § 103.01 is a misdemeanor, and general code violations otherwise carry the § 10.99 penalty of up to 90 days or a $1,000 fine.

Frequently Asked Questions

Where can I put a ground-mounted solar system in Brooklyn Park?
In residential zoning districts, § 152.1002(D)(2)(a) limits ground-mounted solar systems to the rear yard. In nonresidential districts they can go in the side yard if they meet the accessory structure standards in § 152.1001(B).
How tall can a ground-mounted solar array be?
Up to 15 feet in height when oriented at its maximum tilt, under § 152.1002(D)(2)(b). Roof-mounted systems instead follow the maximum building height allowed in the applicable zoning district.
What happens if a solar system stops working?
If it stays nonfunctional or inoperative for a full year, § 152.1002(D)(3) deems it abandoned and a public nuisance, and the owner must remove the entire structure, including transmission equipment, after getting a demolition permit.

Sources & Official References

Other rules in Brooklyn Park

All Brooklyn Park rules

Compare Brooklyn Park to another location·View the Minnesota solar energy overview

Get notified when Panel Permits in Brooklyn Park, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Hennepin County handle panel permits.

Minneapolis, MN
Some Restrictions