Florence County, SC Solar Energy: Panel Permits (2026)
Key Facts
- Permitting authority
- Florence County Planning Department
- Application
- 3 sealed site plans, 11x17 or larger
- Level II trigger
- Stormwater NPDES permit if disturbance ≥1 acre
- Airport districts
- FAA letter required
- Fees
- Set under § 30-296 fee schedule
- Penalty
- § 30-274 misdemeanor via § 30-114.6
Summary
Unincorporated Florence County requires a solar energy system application through the Planning Department before any roof- or ground-mounted panel array goes in. Sec. 30-114.1 spells out the site-plan package, sealed engineering details and, for Level II systems, a stormwater NPDES permit, interconnection agreement, fire department review and FAA letter near airports. Fees run through the certificate-of-zoning-compliance schedule and violations carry the same penalty as any other zoning breach.
Applicants shall apply to the planning department and meet the following requirements: (1)Complete and submit a solar energy systems application.(2)Submit three, scaled 11-inch by 17-inch or larger, site plans by a licensed land surveyor, landscape architect, or engineer. ... (4)Level I SES approval is subject to:a.Interconnection utility agreement (grid-tied systems).b.Restrictive covenants affidavit (if applicable).c.FAA letter (applicable within airport districts).(5)Level II SES approval is subject to:a.Stormwater NPDES permit from SCDHEC or the county. ... b.Interconnection utility agreement (grid-tied systems).c.Fire department review and approval.d.Restrictive covenants affidavit (if applicable).e.Approved site plan.f.FAA letter (applicable within airport districts).
Full Breakdown
Florence County splits solar permitting by system size. Sec. 30-114.1 governs Level I (small, mostly roof-mounted or limited ground-mounted) and Level II (larger ground-mounted) systems. Applicants apply to the planning department and must 'complete and submit a solar energy systems application' and 'submit three, scaled 11-inch by 17-inch or larger, site plans by a licensed land surveyor, landscape architect, or engineer,' showing the developer's contact information, tax map number, property boundaries, adjacent land uses, water bodies with a 40-foot buffer, flood hazard areas, wetlands and the area of any land disturbance. Sealed structural plans certified by a licensed engineer are required too, covering wiring diagrams and maximum height, though an individual residential PV system installed to the manufacturer's instructions is exempt from that structural-seal step.
Level I approval turns on an interconnection utility agreement for grid-tied systems, a restrictive covenants affidavit where applicable, and an FAA letter if the site sits in an airport district. Level II approval adds a stormwater NPDES permit from SCDHEC or the county, with a SWPPP required once land disturbance reaches one acre, plus fire department review and an approved site plan.
Design standards live in the companion Sec. 30-114, which sets ground-mounted setbacks (five feet for Level II, 50 feet for Level III) and a 20-foot height cap at maximum tilt, and requires anti-reflective coating on collectors. Fees are billed under Sec. 30-296's zoning-compliance fee schedule, and Sec. 30-114.6 routes penalties to the chapter's general enforcement section, Sec. 30-274.
Violations & Fines
Sec. 30-114.6 ties solar permit violations to Sec. 30-274, the zoning chapter's general penalty: a misdemeanor with a court-set fine for each offense. The zoning administrator can also seek an injunction to stop an unpermitted installation, and every day the system runs without the required Level I or Level II approvals counts as a separate violation.
Frequently Asked Questions
Who do I apply to for a home solar installation in unincorporated Florence County?
When does a solar project need a stormwater permit?
Does an airport-area solar project need extra sign-off?
Sources & Official References
Other rules in Florence County
Compare Florence County to another location·View the South Carolina solar energy overview