Dixmont, ME Solar Energy: Panel Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit authority
Dixmont Planning Board
Filed with
Code Enforcement Officer, forwarded to Planning Board
Application fee, industrial
$2,500
Application fee, commercial
$500
Permit fee
$1.00 per kW, $25 minimum
Private residential system
No permit fee under 2,000 square feet and 21 kW

Summary

Dixmont's Solar Ordinance, adopted by Town Meeting March 19, 2022, requires a Planning Board permit for solar energy systems. Application fees run $2,500 for industrial, $500 for commercial and $150 for residential-business systems, plus $1.00 per kW with a $25 minimum. Private residential systems under 2,000 square feet and 21 kW carry no permit fee.

1. Industrial Solar Energy Systems (ISES). ... The Application Fee is $2,500. 2. Commercial Solar Energy Systems (CSES). The Application Fee is $500. ... B. Permit Fee: 1. $1.00 per kW with a minimum fee of $25 for ISES, CSES, and RBSES. 2. There is no permit fee for PRSES. ... 1. Name, address, and telephone number of applicant, property owner, SES owner, and SES operator. ... 5. A description of how and to whom the energy produced will be sold.

Full Breakdown

Section 3 of the Dixmont Solar Ordinance makes every Solar Energy System subject to location and permitting requirements. A system approved for construction before the effective date is not bound by it. Expanding or relocating the footprint of an existing system requires approval, while routine maintenance or replacements do not require a permit. A permit cannot be transferred without notice to, and approval by, the Planning Board, and all conditions of the original permit bind the new holder.

Applications go on town forms to the Code Enforcement Officer with the required fees and plans, and the officer forwards them to the Planning Board when applicable. The Planning Board decides whether an application is complete. Section 10 vests the Dixmont Planning Board with authority to approve, approve with conditions, or reject any application, and lets it hire independent consultants at the applicant's cost.

Fees under Section 5 follow the class. The application fee is $2,500 for industrial systems (2 acres or 500 kW and above), $500 for commercial systems (3,000 square feet or 31 kW up to those limits) and $150 for residential-business systems (under 3,000 square feet or under 31 kW). The permit fee is $1.00 per kW with a minimum of $25 for those three classes. A private residential system under 2,000 square feet and 21 kW has no permit fee, is subject to the terms of the Dixmont Building Code, and is treated as an Accessory Structure or Use for application fees.

Section 6 lists what an industrial or commercial application must contain, at the applicant's cost: owner and operator contact details, proof of technical and financial capacity, evidence of title, how and to whom the energy will be sold, the interconnection agreement, equipment specifications, a construction timeline, an operations and maintenance plan, an emergency management plan, a stormwater plan certified by a Maine licensed professional engineer, a background noise measurement and a decommissioning plan with a removal guarantee. Under Section 7(3), approved industrial and commercial permits are recorded at the Penobscot County Registry of Deeds within seven calendar days of approval and before construction begins.

Violations & Fines

Section 12 provides that the Solar Ordinance is enforced by the municipal officers or their designee, and a violation is subject to the enforcement and penalty provisions of 30-A, M.R.S. § 4452. Expanding or relocating an existing system's footprint without approval, or transferring a permit without Planning Board approval, falls outside the permit the ordinance requires. Section 8 gives the Code Enforcement Officer a role in decommissioning and abandonment determinations.

Frequently Asked Questions

Who issues a solar permit in Dixmont?
The Planning Board. Section 10 vests the Dixmont Planning Board with authority to approve, approve with conditions, or reject any application for a Solar Energy System. Applications are submitted to the Code Enforcement Officer, who forwards them to the Board when applicable, and the Board determines whether an application is complete.
What does a solar permit cost?
The application fee is $2,500 for industrial, $500 for commercial and $150 for residential-business systems. The permit fee is $1.00 per kW with a minimum of $25 for those classes. A private residential system under 2,000 square feet and 21 kW has no permit fee, though application fees follow the Building Code Ordinance for accessory structures.
Does routine panel replacement need a new permit?
No. Section 3 says physical modifications that expand or relocate the footprint of an existing system require approval under the ordinance, but routine maintenance or replacements do not require a permit. A system approved before the March 19, 2022 effective date is not required to meet the ordinance terms.
Is the permit recorded anywhere?
Yes, for industrial and commercial systems. Section 7(3) requires all approved permits to be recorded at the Penobscot County Registry of Deeds within seven calendar days of approval and before project construction begins. A permit cannot be transferred without notice to, and approval by, the Planning Board.

Sources & Official References

Other rules in Dixmont

All Dixmont rules

Compare Dixmont to another location·View the Maine solar energy overview

Get notified when Panel Permits in Dixmont, ME changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.