Key Facts
- Permit issued by
- city manager or designee
- Governing section
- Dubuque City Code § 14-14-2
- Shading limit
- max 15% obstructed, 9am-3pm
- Plot plan radius
- shadow sources within 20 feet
- Design standard
- 2009 Uniform Solar Energy Code
- Homeowner installer exemption
- with NICC certification (14-13-7)
Summary
In the City of Dubuque, installing or altering a solar thermal collector system requires a permit from the city manager under City Code 14-14-2. The application must include a plot plan showing shading obstacles within 20 feet of the collector, and no more than 15 percent of the collector's solar path may be shaded between 9 a.m. and 3 p.m.
14-14-2: PERMIT REQUIRED: ... A permit shall be obtained from the city manager or the city manager's designee for the installation of or alteration to a solar thermal system. Information shall be attached to an application for a permit as set by the city manager or the city manager's designee. ... 14-14-5: ... SHADING OF SOLAR COLLECTORS: No more than fifteen percent (15%) of the area of the solar path shading diagram shall be obstructed between nine o'clock (9:00) A.M. and three o'clock (3:00) P.M. throughout the year.
Full Breakdown
Dubuque City Code chapter 14 of title 14, Solar Thermal System Permits and Inspections, defines a solar thermal system as equipment that directly converts and then transfers or stores solar energy into usable thermal energy (14-14-1). Section 14-14-2 requires a permit from the city manager or the city manager's designee for the installation of, or alteration to, a solar thermal system, with required information attached to the application as the city manager sets. The permit application under 14-14-3 must include the applicant's name and address, business name and any solar thermal license number, the project address, a plot plan showing the proposed collector location and any tree or structure that presently casts a shadow within 20 feet of it, and detailed drawings of all piping, pumps, blowers, wiring, storage vessels, dampers, valves, insulation and the backflow prevention device.
Inspections are required prior to activation of the system (14-14-4). Section 14-14-5 caps shading of the solar path diagram at no more than 15 percent obstructed between 9:00 a.m. and 3:00 p.m. throughout the year. Chapter 13 of the same title separately licenses solar thermal installers, requiring NABCEP certification or completion of a 40-hour Northeast Iowa Community College course plus two training installations, though a homeowner installing or altering a system on their own residence is exempt from that installer license if they hold the NICC certification or equivalent city manager-approved training (14-13-7). Minimum design and materials standards for liquid systems, insulation, storage tanks and heat transfer fluid follow the 2009 Uniform Solar Energy Code (14-14-6, 14-14-9).
Violations & Fines
Installing or altering a solar thermal system without the city manager's permit, or exceeding the 15 percent shading limit on the collector's solar path between 9 a.m. and 3 p.m., violates City Code 14-14-2 and 14-14-5, enforced through the city's building permit and inspection process.
Frequently Asked Questions
Do I need a permit to install solar panels in Dubuque?
Is there a shading rule for solar collectors in Dubuque?
Can a homeowner install their own solar thermal system in Dubuque without a contractor license?
Sources & Official References
Other rules in Dubuque
Compare Dubuque to another location·View the Iowa solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.