Durham, NC Solar Energy: Panel Permits (2026)
Key Facts
- Zoning status
- allowed accessory use, any district
- Building permit fee
- $65.00
- Plan review fee
- $70.00
- Residential inspection fee
- $100.00
- Commercial inspection fee
- $150.00
- Setback for equipment in yard
- 3 feet from property line
Summary
Durham allows solar energy systems as an accessory use in every zoning district, but installing one still requires a building permit: the City's Fee Schedule sets a $65 Solar Photovoltaic Power Systems Permit fee plus a $70 plan review fee, and electrical inspections run $100 for residential systems.
Pursuant to city code section 10-50(a), the following schedule of fees applies to permits required by city code section 10-48... Schedule G. Fire Prevention Construction Permits and Plans Review Fees: ... Solar Photovoltaic Power Systems Fees Solar Photovoltaic Power Systems Permit 65.00 Solar Photovoltaic Power Systems Review Fee 70.00
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 36).
Full Breakdown
UDO Sec. " No special use permit, conditional use review, or extra dimensional standard applies to solar under Article 5 -- it's treated the same as any other accessory equipment. 00 plan review fee. 00 charge per trip for a third or later inspection). Placement of the equipment is also constrained by the UDO's yard-encroachment rules: mechanical equipment for a solar energy system "can extend into any required side and rear yard but shall remain at least three feet from the property line" under Sec.
B. Property owners should budget for the combined building-permit, plan-review, and electrical-inspection fees before scheduling installation, since all three are billed separately under the Fee Schedule rather than bundled into one flat charge.
Violations & Fines
Installing a solar photovoltaic system without the required building permit and paying the associated Part 4-101/Part 4-104 fees exposes the installer to the standard City-County Inspections enforcement process for unpermitted work, including a doubled fee if work begins before a permit is issued ("Work begun without a permit -- Double Fee") under the same Fee Schedule that sets the base permit charges.
Frequently Asked Questions
Do I need a permit for solar panels in Durham?
How much does a Durham solar panel inspection cost?
Can I put solar equipment near my property line in Durham?
Sources & Official References
Other rules in Durham
Compare Durham to another location·View the North Carolina solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.