Skip to main content
CityRuleLookup

Franklin County, KY Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Building permit fee
Solar array $200 (§ 150.02(D))
Electrical inspection fee
Solar $100 (§ 150.05(D))
Plan review
$25 on the residential schedule
Front placement
Not in front of structure on lots under one and one-half acres
Side yard
Not in required side yard on lots under one and one-half acres
Lot line distance
No closer than the height of the device

Summary

In unincorporated Franklin County, Kentucky, a residential solar array carries a $200 building permit fee under § 150.02 and a separate $100 electrical inspection fee under § 150.05. Section 155.218 places solar collectors as accessory uses, with location limits on lots under one and one-half acres.

These county ordinances apply to unincorporated areas of Franklin County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(D) The fee for the inspection and issuance of permits for the construction of any new structure, addition, rehabilitations and conversions, save and except agricultural buildings shall be based on the following fee schedule: RESIDENTIAL ... Solar array $200 ... Residential Inspections: Fee Amounts ... Solar $100 ... Special devices, now known such as television microwave dish receivers, solar collectors or any not currently anticipated by this chapter, may be permitted as an accessory use in any zoning district; providing that: (A) No such device may be located in front of any structure on lots less than one and one-half acres; (B) No such device shall be located within any required side yard on lots less than one and one-half acres; and (C) No such device shall be located closer to any lot line than the height of that device.

Full Breakdown

The Franklin County Fiscal Court sets two printed fees for residential solar. Section 150.02(D) lists a Solar array line at $200 in the residential schedule for inspection and issuance of building permits. Section 150.05(D) lists Solar at $100 in the residential electrical inspection schedule. Section 150.05(B) makes an electrical permit and inspection a precondition to constructing or erecting structures outside the City of Frankfort, and § 150.05(C) has a certified electrical inspector of the Fiscal Court perform that work and issue the permits. The electrical contractor furnishes a copy of the contract to the Planning and Building Codes Department when applying (§ 150.05(E)).

Zoning treats a solar collector as a special device. Section 155.218 allows special devices, including solar collectors, as an accessory use in any zoning district, provided no device is located in front of any structure on lots less than one and one-half acres, no device is located within any required side yard on lots less than one and one-half acres, and no device is located closer to any lot line than the height of that device. The accessory use table in § 155.217 also carries a Solar collectors row under agriculture residence uses with its own front, side and rear entries, so a project should be checked against both sections before the permit is filed.

Section 150.02(E) states that filing an application after commencing construction can result in additional fees, and § 150.02(F) provides that collected fees become county property. Because the Kentucky Building Code and Residential Code apply under § 150.02(A), plans are reviewed against those codes, with a $25 plan review line in the residential schedule.

Violations & Fines

A violation of § 150.02 or a failure to comply with an inspection order within the stated time is a misdemeanor under § 150.99(B), fined not less than $25 and not more than $500, or up to one year in jail, or both. Violations of § 150.05 carry the same range under § 150.99(C), and each day counts as a separate offense. Zoning violations under Chapter 155 are punished under § 155.999 by a fine not to exceed $250 per day.

Frequently Asked Questions

How much is a solar panel permit in unincorporated Franklin County, Kentucky?
Section 150.02(D) charges $200 for a residential Solar array. Section 150.05(D) separately charges $100 for the residential Solar electrical inspection. Both appear in the Franklin County Fiscal Court's fee schedules, and filing after construction starts can bring additional fees.
Where can solar collectors be placed on a Franklin County lot?
Section 155.218 allows them as an accessory use in any zoning district. On lots under one and one-half acres, no device may sit in front of a structure or within a required side yard, and on every lot no device may be closer to a lot line than the device is tall.
Is an electrical permit required for solar in Franklin County, KY?
Section 150.05(B) requires an electrical permit and inspection before building structures outside Frankfort, and the schedule lists a $100 Solar fee. A certified electrical inspector of the Fiscal Court performs the inspection and issues the permit after the fee is paid.
Does the city of Frankfort follow these solar rules?
No. Sections 150.02 and 150.05 apply to the county outside the corporate limits of the City of Frankfort, and Chapter 155 governs unincorporated Franklin County, Kentucky. Frankfort is a separate jurisdiction with its own code.

Sources & Official References

Other rules in Franklin County

All Franklin County rules

Compare Franklin County to another location·View the Kentucky solar energy overview

Get notified when Panel Permits in Franklin County, KY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.