LaPorte County, IN Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Base fee
$125 per 10 kW
Additional fee
$25 per each further 10 kW
Fee section
§ 151.27(X), added Ord. 2017-9
Also requires
electrical wiring permit, § 151.20(A)
Unpermitted work penalty
fee tripled, § 151.26(C)

Summary

LaPorte County charges a building permit fee for solar panel installations in the unincorporated county under § 151.27(X): $125 for the first 10 kilowatts of capacity, plus $25 for each additional 10 kilowatts at the same site. The permit itself is required under the county's general work-permit rule at § 151.26(B).

These county ordinances apply to unincorporated areas of LaPorte County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(X) Solar panels. $125 per 10 KW, plus additional $25 per each additional 10 KW at same site.

Full Breakdown

27(X), added by Ordinance 2017-9, prices a solar panel permit at $125 per 10 kilowatts (KW) of installed capacity, with an additional $25 charged for every further 10 KW installed at the same site, so a 30 KW system runs $125 for the first block plus $50 for the next two, for $175 total. 26(B), which bars anyone from performing or causing to be performed any work in the unincorporated county without first obtaining a permit from the Building Department. C. , governs the wiring work itself. 21(B), including confirmation that the installation meets zoning requirements before the permit issues.

Violations & Fines

Installing solar panels without first obtaining the § 151.27(X) permit is unpermitted work under § 151.26(C), which triples the fee as a penalty once the county catches the violation, in addition to any other penalty available. If the installation is also unpermitted electrical work under § 151.20, the Building Commissioner can issue a stop order under § 151.23(E), and continuing after being served exposes the installer and property owner to the fines and remedies at §§ 150.15 through 150.21.

Frequently Asked Questions

How much does a solar panel permit cost in LaPorte County?
Under § 151.27(X), the permit fee is $125 for the first 10 kilowatts of installed capacity, plus $25 for each additional 10 kilowatts installed at the same site. A typical 20 KW residential system would run $150 total under that formula.
Do I need an electrical permit in addition to the solar fee?
Yes. Because a solar array ties into the building's wiring, § 151.20(A) requires a permit for the new electrical wiring itself, and that work must meet the state Electrical Code the county adopts at § 151.05(F), 675 I.A.C. 17-1.5-1 et seq., on top of the § 151.27(X) solar fee.
What happens if I install solar panels without a permit?
The county treats it the same as any other unpermitted work: § 151.26(C) triples the permit fee as a penalty once the violation is discovered, and the Building Commissioner can also issue a stop-work order under § 151.23(E) that halts the installation until it is brought into compliance.

Sources & Official References

Other rules in LaPorte County

All LaPorte County rules

Compare LaPorte County to another location·View the Indiana solar energy overview

Get notified when Panel Permits in LaPorte County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.