North Charleston, SC Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Filing fee
$30 (non-refundable)
New/upgraded service
$0.25 per amp
Additional/alteration permit
$30
Re-inspection fee
$50
Unpermitted work penalty
triple all permit fees
Contractor licensing
required for electrical work

Summary

Installing solar panels in North Charleston requires an electrical permit under the city's Electrical/Solar Panels Permits fee schedule in Appendix A to Chapter 5, which charges a flat filing fee plus a per-amp charge for any new or upgraded electrical service the panels require.

ELECTRICAL/SOLAR PANELS PERMITS Application filing fee $30.00 (non-refundable) New or upgrade services $0.25 per amp Additional or alterations $30.00 Temp. pole/trailer pole/signs $30.00 (no filing fee) Re-inspection fee $50.00 (non-refundable) Safety $30.00

Working without permits Penalty for this violation shall be a triple fee of all permit fees

(Ord. No. 2019-008, Att., 2-14-2019)

GAS PERMITS Application filing fee $30.00 (non-refundable) One to four outlets $10.00 Each additional outlet $2.00 One unit (burner, furnace) $5.00 Each additional burner or furnace $1.00 Re-inspection Fee $50.00 (non-refundable) Safety $30.00

Working without permits Penalty for this violation shall be a triple fee of all permit fees

(Ord. No. 2019-008, Att., 2-14-2019)

MECHANICAL PERMITS Application filing fee $30.00 (non-refundable) Heating, ventilating duct $10.00 for the first $1,000.00 of value and $2.00 for each additional $1,000.00 of value or fraction thereof Boiler based on BTU input: 33,000 BTU (1 BHP) to 165,000 (5 BHP) $5.00 ... 165,000 BTU (5 BHP) to 330,000 (10 BHP) $10.00 ... 330,001 BTU (10 BHP) to 1,165,000 (52 BHP) $15.00 ... 1,165,001 Re-inspection Fee $50.00 (non-refundable) Working without permits Penalty for this violation shall be a triple fee of all permit fees

(Ord. No. 2019-008, Att., 2-14-2019)

PLUMBING PERMITS Application filing fee $30.00 (non-refundable) Each plumbing fixture $3.50

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 75).

Full Breakdown

00 non-refundable re-inspection fee if work fails its first inspection. Because mounting solar panels involves electrical connection work, Sec. 5-33(a)(3) requires that all electrical work be permitted in the name of an appropriately licensed contractor or subcontractor, and Sec. 5-33(b)(1) confirms that even a homeowner working on a primary residence loses the self-permitting option once the work involves electrical and/or gas. That licensed electrical work is inspected against the National Electrical Code the city adopts under Sec. 5-75(c)(7) as one of the standardized codes currently adopted by the State of South Carolina.

Once issued, a residential solar/electrical permit follows the same expiration rule as other residential permits under Sec. 5-311: it automatically expires no later than twelve months after issuance unless the building official grants a single extension of up to 180 days on a written request showing substantial work already done, and it lapses early if no substantial work occurs for any ninety consecutive days, with no refund of fees already paid.

Violations & Fines

The Appendix A fee table itself states that working without permits carries a penalty equal to a triple fee of all permit fees. On top of that civil surcharge, Sec. 5-16(b) makes it a misdemeanor to alter or add to a structure, including installing solar panels that require electrical work, without first obtaining the required permit, punishable under the North Charleston and South Carolina codes with each day of continued work a separate offense.

Frequently Asked Questions

How much does a solar panel permit cost in North Charleston?
A solar installation is permitted as electrical work: Appendix A to Chapter 5 charges a $30.00 non-refundable filing fee plus $0.25 per amp for the new or upgraded electrical service the panel system requires, with a further $30.00 charge for any later alterations.
Can a homeowner install their own solar panels without a licensed contractor?
No. Sec. 5-33(b)(1) lets a homeowner pull permits to personally work on a primary residence only for work that does not involve electrical or gas, and solar panel installation is electrical work, so Sec. 5-33(a)(3) requires it be permitted in the name of a licensed electrical contractor.
How long is a North Charleston electrical/solar permit valid?
A residential solar/electrical permit expires twelve months after issuance under Sec. 5-311, the same rule that governs other residential building permits, with one possible written-request extension of up to 180 days if substantial work is already underway.
What happens if I install solar panels without a permit?
The Appendix A fee schedule imposes a penalty equal to a triple fee of all permit fees for working without permits, and Sec. 5-16(b) separately makes unpermitted alteration of a structure a misdemeanor, with each day the unpermitted work continues charged as its own offense.

Sources & Official References

Other rules in North Charleston

All North Charleston rules

Compare North Charleston to another location·View the South Carolina solar energy overview

Get notified when Panel Permits in North Charleston, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.