Provo, UT Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing law
Provo City Code 12.03.080
Review window
30 days to issue or deny
Appeal deadline
30 days to Mayor after denial
Residential fee (100-200A)
$375.00 net metering hookup
Commercial/residential fee (200-400A)
$825.00 net metering hookup
Under-25kW condition
Must sign Net Metering Agreement

Summary

Provo runs its own electric utility, so home solar panels need a generation license from the Department, not a zoning permit. Applicants submit a license application, wait up to 30 days for a decision, and sign a Net Metering Agreement before connection.

Except as otherwise provided in Section 12.03.090, Provo City Code, this Section shall govern the generation and transmission of electric energy in Provo City by entities other than Provo City. Electric energy may not be generated or transmitted in Provo City without a license therefor... The applicant shall complete and submit the license application for consumer generation to the Department. The Department shall have thirty (30) days to review the license application and either issue a license or deny the license request. The Department's denial of a license application may be appealed to the Mayor within thirty (30) calendar days from the date written notice of denial is sent by the Department... A license for the generation of less than twenty-five (25) kW is subject to the following additional conditions: (i) The license is conditioned upon the licensee entering into the standard "Net Metering Agreement" between the licensee and the City; (ii) The licensee shall adhere to the current "Net Metering Standards" adopted by the Department.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).

Full Breakdown

080, not just pulling a building permit. 080(1) makes generating or transmitting electric energy in the city unlawful without a license, and unauthorized generation can be grounds for disconnection at the Department Director's discretion. 080(2), the homeowner submits a license application for consumer generation to the Department, which then has thirty days to review it and either issue or deny the license; a denial can be appealed to the Mayor within thirty calendar days of the written notice. The Director may only issue the license if the installation will conform to all local, state and federal requirements, will not add technical or financial burden to the electric system beyond what is normal for properly designed distributed generation, and will not endanger the health, safety or welfare of residents or Department employees.

080(4)(e): the license is conditioned on signing the City's standard Net Metering Agreement and adhering to the Department's current Net Metering Standards. Noncompliance with those standards triggers immediate suspension and disconnection without advance notice, and the licensee bears the Department's actual enforcement costs. 00 for 200-400 amp commercial/residential service. 080(6) for everyone else, with unused credits lapsing at the February billing cycle each year. The Department may also inspect licensed generation facilities at any reasonable time and can impose conditions to protect system reliability.

Violations & Fines

Generating or transmitting electricity, including solar, without a Department license violates 12.03.080(1) and is grounds for disconnection from the city electrical system at the Director's discretion. A licensee who violates the Net Metering Standards faces immediate suspension and disconnection without advance notice, and must remedy the violation and pay the Department's actual enforcement costs before reinstatement or reconnection.

Frequently Asked Questions

Do I need a permit to put solar panels on my house in Provo?
You need a generation license from the Provo Department of Energy, not a standalone zoning permit, because the city runs its own electric utility. Submit a license application for consumer generation; the Department has 30 days to approve or deny it under Provo City Code 12.03.080(2).
What happens if the Department denies my solar license application?
You can appeal the denial to the Mayor within 30 calendar days of the date the Department sends written notice, per Provo City Code 12.03.080(2). The Director can only deny if the system fails the code's technical, safety, or welfare standards.
How much does it cost to connect residential solar to Provo's grid?
The Consolidated Fee Schedule under Provo City Code Chapter 12.02 lists $375.00 for net metering/solar hookups on 100-200 amp residential service and $825.00 for 200-400 amp commercial/residential service.
Can Provo disconnect my solar system after it's licensed?
Yes. Under 12.03.080(4)(e)(ii), failing to follow the Department's Net Metering Standards triggers immediate suspension and disconnection without advance notice, and you must fix the violation and cover the Department's enforcement costs before reconnection.

Sources & Official References

Other rules in Provo

All Provo rules

Compare Provo to another location·View the Utah solar energy overview

Get notified when Panel Permits in Provo, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Utah County handle panel permits.

Eagle Mountain, UT
Some Restrictions
Lehi, UT
Some Restrictions