Sherman, TX Solar Energy: Panel Permits (2026)
Key Facts
- Engineering rule
- Stamped by a design professional, § 3.03.003(5)
- Single-family solar permit
- $75.00, plus $30.00 per additional inspection
- Commercial solar fire permit
- $150.00, excluding one- and two-family dwellings
- Where to apply
- Development services, online permit portal
- Electrician license
- Texas Electrician License from TDLR
- Fire access roads
- Can be modified where approved by fire code official
Summary
In the City of Sherman, Texas, solar photovoltaic systems and solar panel installations must be engineered by a design professional bearing his or her stamp, under the electrical code amendments in § 3.03.003(5). The Appendix C fee schedule lists a solar permit at $75.00 and $30.00 for each additional inspection on single-family work.
The following additions, amendments and/or deletions to the National Electrical Code (NEC), 2023 edition, are hereby adopted: ... (5) Solar Photovoltaic (PV) Systems or Solar Panels. Solar photovoltaic (PV) systems or solar panels installations must be engineered by a design professional bearing his or her stamp.
Full Breakdown
The engineering rule is item (5) of § 3.03.003 of the Sherman Code of Ordinances, an amendment to the 2023 National Electrical Code: solar photovoltaic (PV) systems or solar panels installations must be engineered by a design professional bearing his or her stamp. The code does not set a size threshold, so the stamped engineering applies to every installation in the City of Sherman, Texas.
The permit itself follows the general machinery of Chapter 3. Under § 3.01.002, anyone who intends to install an electrical system regulated by code applies for the permit first, and the permit covers only the work described in the application. Applications go to the development services department through the city's online permit portal (§ 3.01.004), and incomplete submittals are not accepted. Electrical contractors must register with the city and hold an active State of Texas Electrician License from the Texas Department of Licensing and Regulation (§ 3.01.003), with liability insurance of $300,000.00 per occurrence. Homeowners working on their own homestead are exempt from the contractor registration requirement. Inspections are scheduled by the contractor through the portal (§ 3.01.005), and no utility can permanently install a meter until construction is approved.
The Appendix C fee schedule lists a solar permit at $75.00 and $30.00 for each additional inspection in its single-family residential table. Its fire permit and service fee list separately shows solar photovoltaic power systems, excluding single and double family dwellings, at $150.00. Under the fire code amendments in § 3.04.001, where approved by the fire code official, fire apparatus access roads can be exempted or modified for solar photovoltaic power generation facilities. The zoning ordinance defines and lists the use electric power substation or generating including ground-mounted solar and wind in §§ 14.08.001 and 14.10.001.
Violations & Fines
Installing without the required permit draws an administration fee from Appendix C plus the permit fees, under § 3.01.002(a)(2). Violations are punishable under § 1.01.009: a fine up to $500.00, or up to $2,000.00 where the rule governs fire safety or zoning, with each day a separate offense. A contractor with two convictions in twelve months can lose its city registration.
Frequently Asked Questions
Does a Sherman solar installation need an engineer?
How much is a solar permit in Sherman?
Who can install solar panels on a Sherman home?
Do ground-mounted systems face zoning review?
Sources & Official References
Other rules in Sherman