St. Martin Parish, LA Solar Energy: Panel Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Permit needed before
Construction, erection, establishment, expansion, or substantial alteration
Solar farm threshold
At least 50 kilowatts direct current
Fee, 500 acres or less
$1,000.00
Fee, over 500 acres
$1,000.00 plus $1.00 per acre over 500
Administrative review
Within 30 days of submittal
Council presentation
Within 90 days by the parish president
Buffer setbacks
100 feet to road center, 150 feet from residence, 50 feet from property line
Permit duration
Expires one year after issuance unless construction commenced

Summary

Building a solar farm in unincorporated St. Martin Parish requires a parish permit under Section 20-402 before construction, expansion, or substantial alteration. A solar farm is a photovoltaic installation of at least 50 kilowatts direct current, the fee starts at $1,000.00, and the parish council gives final approval or denial by majority vote.

These county ordinances apply to unincorporated areas of St. Martin Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Solar farm means the use of land ... for the purpose of generating photovoltaic power which has a generation capacity of at least 50 kilowatts direct current (dc) or more when operating at maximum efficiency. "Solar farm" shall not be interpreted to mean one or more solar collectors intended to provide electrical power generation for a single residential dwelling or single commercial establishment. ... (a)Prior to the construction, erection, establishment, expansion, or substantially altering of a solar farm, a permit must be obtained by the developer from the Parish of St. Martin. Permits shall be issued only after the plan therefor has been approved as provided for in this chapter. ... the applicant shall pay a sum of $1,000.00 for any solar farm consisting of 500 acres or less. For a solar farm consisting of more than 500 acres, the fee shall be $1,000.00 plus an additional $1.00 for each acre in excess of 500 acres. ... The a ... dministrative review, to confirm the application is complete and meets design parameters set forth in this chapter, shall be completed within 30 days of application submittal.

Full Breakdown

Article XI of Chapter 20, adopted March 7, 2023 as Ord. No. 23-03-1386-OR, regulates the licensure, operations, and siting of solar farms within the unincorporated areas of St. Martin Parish. Section 20-401 defines a solar farm as a use of land with photovoltaic generation capacity of at least 50 kilowatts direct current. One or more collectors serving a single residential dwelling or a single commercial establishment are not a solar farm, so this permit does not reach a system on one home.

The application goes to the parish supervisor of permits. It must include a site plan showing all property in the project, all access roads, and the buffer zones, plus a drainage study, environmental study, maintenance plan, and traffic plan. Before filing, the applicant holds at least one public meeting under the planning and zoning director or a designee, with notice published in the official journal at least ten days and no more than 30 days beforehand and posted on the parish government website. The applicant pays the publication costs.

The fee is $1,000.00 for a solar farm of 500 acres or less, and $1,000.00 plus $1.00 for each acre over 500 for a larger one, measured on the entire project including buffer zones and access roads. The permits supervisor checks completeness, the director of public works reviews next, and the parish president finishes administrative review within 30 days of submittal. The president then presents the plans and studies to the parish council within 90 days for approval or denial, decided by majority vote of the entire council.

A denial comes with a written statement of reasons, and the applicant has 30 days to submit more information or an amended plan. A final denial can be appealed to the parish president, who acts within 14 days, and then to the council within 90 days of the president's decision. A permit expires one year after issuance unless construction has commenced or an extension is requested at least 30 days before expiration. Section 20-411 classifies every solar farm as I-1 (Light Industrial) under the Zoning Ordinance, reverting to the original class on decommissioning.

Violations & Fines

Under Section 20-402(i), the permit gives St. Martin Parish Government standing to enforce every obligation by any means allowed by law, including suits for damages or injunctions in the 16th Judicial Court. Section 20-410 adds a $500.00 penalty for each day a maintenance deficiency stays unremedied, starting 30 days after written notice. Section 20-406 allows revocation of the permit for buffer zone violations. Cessation of operations beyond 180 days in a calendar year triggers decommissioning and termination of the permit under Section 20-408.

Frequently Asked Questions

Does a rooftop system on one home need this solar farm permit?
No. Section 20-401 says a solar farm cannot be interpreted to mean collectors intended to provide electrical power for a single residential dwelling or single commercial establishment. The Section 20-402 permit, public meeting, and fee apply only to installations generating at least 50 kilowatts direct current in unincorporated St. Martin Parish.
How long does the parish take to decide a solar farm permit?
The administrative review through the permits supervisor, the director of public works, and the parish president must finish within 30 days of application submittal. The parish president then has 90 days to present the application, plans, and studies to the parish council, which approves or denies by majority vote of the entire council at a regular or special meeting.
What setbacks does a solar farm in St. Martin Parish need?
Section 20-406 requires a buffer zone with a setback of not less than 100 feet from the solar panel array to the center of any adjacent public roadway, at least 150 feet from any residence, and 50 feet from any adjacent property line. The buffer also needs trees or shrubbery dense enough at maturity to screen the farm from view.
What happens when a solar farm stops operating?
Section 20-408 triggers the decommissioning plan and permit termination when operations cease for more than 180 days in the aggregate in any calendar year. The plan must remove the panels, ancillary structures, and infrastructure and remediate environmental hazards, and Section 20-409 requires a bond or other financial security payable to St. Martin Parish Government.

Sources & Official References

Other rules in St. Martin Parish

All St. Martin Parish rules

Compare St. Martin Parish to another location·View the Louisiana solar energy overview

Get notified when Panel Permits in St. Martin Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.