Key Facts

1 to 25 panels, microinverters, optimizers
$80 (§ 161-2B(3))
Each additional 25 units
$35
Minimum electrical permit fee
$70
Plan review
Nonrefundable 20% of the permit fee
Work without a permit
Added fee of 15% of permit fee, $50 minimum
Fines under § 161-2L
Up to $100 first offense; $50 to $500 repeat

Summary

In the Town of West New York, New Jersey, a photovoltaic system is priced in the electrical fee schedule of § 161-2: $80 for 1 to 25 panels, microinverters and optimizers, plus $35 for each additional 25 units. Fees are collected before plan review or permit issuance, and the minimum electrical permit fee is $70.

All fees required for plan review and the issuance of any permit or certificate shall be collected prior to the review or the issuance of the permit or certificate. ... (a) The minimum electrical permit fee shall be $70. (b) The fee for all fixtures or devices shall be as follows: Fixture/Device Fee ... Photovoltaic system: 1 to 25 panels, microinverters, optimizers $80 Each additional 25 units $35 1 to 10 kw $60 11 to 50 kw $90 51 to 100 kw $120 Greater than 100 kw $576

Full Breakdown

The only place the Town Code names a photovoltaic system is the electrical fee schedule in § 161-2B(3), part of the West New York Building Department and Code Enforcement Fee Schedule. The fee for fixtures and devices lists the photovoltaic system as $80 for 1 to 25 panels, microinverters and optimizers, then $35 for each additional 25 units. The same listing continues with kw tiers: $60 for 1 to 10 kw, $90 for 11 to 50 kw, $120 for 51 to 100 kw and $576 for greater than 100 kw. The minimum electrical permit fee is $70.

Section 161-2A requires all fees for plan review and the issuance of any permit or certificate to be collected before the review or issuance, and a copy of the schedule is posted in the Central Permit Office. Plan review is a nonrefundable 20% of the permit fee. The Construction Code Official calculates fees under the State Uniform Construction Code, and if that code requires a greater fee than the schedule, the greater fee is due. Payment to the Code Enforcement Department is by money order, certified check or cashier's check.

The permit is issued through the Code Enforcement Department created by § 161-1, which includes an Electrical Subcode Official and a Fire Protection Subcode Official and does business with the public at one office location. A lapsed permit can be reinstated for 25% of the initial permit fee if the application is made within one year of lapse, and for 100% of the initial fee after that.

Starting work without a required permit adds a fee of 15% of the permit fee, with a $50 minimum. A person who knowingly or intentionally fails to obtain a required permit, who keeps working after a written stop-work notice, or who repeatedly builds without permits receives a violation from the Construction Code Official, returnable in the Municipal Court of West New York.

Violations & Fines

Under § 161-2I through K, the Construction Code Official issues a violation, returnable in the Municipal Court of West New York, for knowingly failing to obtain a required permit, for continuing work after a written notice to cease until a permit is issued, and for a pattern of building without permits. Section 161-2L sets a fine not to exceed $100 for a first offense and, for second or repeated offenses, a minimum of $50 and a maximum of $500 for each separate offense, in addition to Uniform Construction Code penalties.

Frequently Asked Questions

How much is a solar panel permit fee in the Town of West New York?
The § 161-2 electrical fee schedule lists a photovoltaic system at $80 for 1 to 25 panels, microinverters and optimizers, and $35 for each additional 25 units. It also lists kw tiers of $60 for 1 to 10 kw, $90 for 11 to 50 kw, $120 for 51 to 100 kw and $576 for greater than 100 kw.
When are the fees paid?
Section 161-2A requires all fees for plan review and the issuance of any permit or certificate to be collected before the review or the issuance. Plan review is a nonrefundable 20% of the permit fee, and payment to the Code Enforcement Department is by money order, certified check or cashier's check.
What if solar work starts without a permit?
Section 161-2H adds a fee of 15% of the permit fee, with a minimum of $50, when work starts without a required permit. The Construction Code Official can also issue a violation returnable in the Municipal Court of West New York, with fines up to $100 for a first offense.
Does the Town Code set solar zoning standards?
The Town Code names a photovoltaic system only in the § 161-2 electrical fee schedule. This page covers that fee schedule and the permit collection and enforcement rules around it, not siting or setback standards, so panel placement questions go to the Code Enforcement Department.

Sources & Official References

Other rules in West New York

All West New York rules

Compare West New York to another location·View the New Jersey solar energy overview

Get notified when Panel Permits in West New York, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.