Davidson County, NC Solar Energy: Panel Permits (2026)
Key Facts
- Construction permit fee
- $100 flat fee, Appendix C
- Legal basis
- N.C. Fire Prevention Code construction permit, § 98.047(D)
- Where to apply
- Central Permitting or the Fire Marshal, § 98.049
- Jurisdiction
- unincorporated Davidson County only
- Unauthorized work fee
- double the normal permit fee
Summary
Davidson County's Fire Marshal treats a solar or photovoltaic power system as a permit-required construction item under the N.C. Fire Prevention Code. Chapter 98's Appendix C sets a flat $100 construction permit fee for Solar and Photovoltaic Power Systems, filed and reviewed through the same Central Permitting process as the county's other fire-code construction permits.
APPENDIX C - Required Construction Permits and Fees (continued)
Construction ... $100 Private Fire Hydrants $100 Smoke Control or Smoke Exhaust System $100 Solar and Photovoltaic Power Systems $100 Spraying/Dipping Operations $100 Standpipe System
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2024 S-15: Supplement contains: Local legislation current through Ordinance passed 4-22-2024; and State legislation through 2023 North Carolina Legislative Service, Pamphlet No. 6).
Full Breakdown
C. Fire Prevention Code in the unincorporated county. C. Fire Prevention Code requires its own separate permit and fee. Appendix C, titled 'Required Construction Permits and Fees,' lists Solar and Photovoltaic Power Systems at a $100 fee alongside other specialized fire-code construction categories such as battery systems, fire alarm and detection equipment, standpipe systems, and smoke control systems. 050. 058. Because Appendix C sits inside the Fire and Life Safety chapter, this $100 fee covers the fire-code construction permit for the solar or photovoltaic system itself; it does not describe any separate electrical or building permit that Central Permitting might also require for the installation under the county's Technical Codes.
Violations & Fines
Installing a solar or photovoltaic power system that requires a construction permit without first securing one is an unlawful act under § 98.073, and § 98.057 doubles the normal permit fee for work started before Central Permitting's approval or without the Code Official's knowledge. The Code Official can also issue a stop-work order under § 98.062, and § 98.999 authorizes civil penalties, equitable relief, or an injunction for continued noncompliance.
Frequently Asked Questions
How much does a solar panel permit cost in Davidson County?
Who issues the solar permit?
Does the $100 fee cover every permit a solar installation needs?
What happens if I install a solar system without this permit?
Sources & Official References
Other rules in Davidson County
Compare Davidson County to another location·View the North Carolina solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.