Skip to main content
CityRuleLookup

Harford County, MD Special Events & Permits: Parade Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Concert over 2,000 spectators
Permit fee
$500 at filing
Minimum bond
$5,000 ($1 per attendee)
Filing deadline
60 days before the concert
Max permit length
10 consecutive days
Decision deadline
60 days after filing
Penalty
Up to $1,000 fine, 6 months jail

Summary

Harford County's code has no separate parade ordinance; its public-assembly permit chapter instead covers concerts. Chapter 68 requires a permit, a $500 fee and a cash bond before any concert exceeding 2,000 spectators on private property.

These county ordinances apply to unincorporated areas of Harford County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

It shall be unlawful for any concert to be held, conducted or performed before a gathering in excess of two thousand (2,000) spectators unless the owner of the property where the concert is to be performed has been granted a permit pursuant to the provisions of this chapter. Permits, once granted, shall be effective only for the period of time for which the concert is to be held, conducted or performed, not to exceed ten (10) consecutive days... A permit fee of five hundred dollars ($500.) shall be paid at the time of filing the permit. The owner shall post a cash bond with the county in the amount of one dollar ($1.) for each person anticipated to attend the concert as finally determined by the Director. In any event, the bond requirement is a minimum of five thousand dollars ($5,000.).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4988582; v46 updated 2026-06-09; through 06-09-2026).

Full Breakdown

Chapter 68, Assemblies, Mass Public, is Harford County's only special-event permit scheme, and it is written around concerts rather than parades, which do not appear anywhere in the county code. Section 68-3 makes it unlawful to hold, conduct or perform a concert before a gathering exceeding 2,000 spectators without a permit from the Department of Inspections, Licenses and Permits, and any permit granted runs only for the concert's own dates, capped at 10 consecutive days. The owner of the property must pay a $500 permit fee when filing and post a cash bond of $1 per anticipated attendee, with a floor of $5,000, as finally determined by the Director.

Applications under § 68-4 must be filed 60 days before the concert and include site plans, crowd-control measures, medical facilities, water and sewage capacity, and the names of performers; the Department circulates the application to the Sheriff's Office, Public Works, Health Department, Fire Marshal, Planning and Zoning, and the Health Planning Commission, each of which reports back within 30 days. Health Department standards under § 68-5 require 3 gallons of potable water per person per day, one flush toilet per 100 attendees, and 27 cubic feet of solid waste collection capacity per 100 attendees daily.

The Director must grant or deny within 60 days and can deny only on specific grounds in § 68-6, such as inadequate parking, security, medical facilities or a performer's recent history of violence, or revoke a permit under § 68-7 for noncompliance, holding the bond for 30 days after the concert to cover cleanup and property damage. County government, the Board of Education and Harford Community College are exempt under § 68-8. Holding a concert without complying is a misdemeanor under § 68-9, punishable by up to $1,000 and 6 months in jail.

Violations & Fines

Holding an unpermitted concert over the 2,000-spectator threshold is a misdemeanor under § 68-9, carrying a fine up to $1,000, imprisonment up to 6 months, or both. The Director can also deny a permit outright under § 68-6 for inadequate security, parking, medical coverage or a zoning violation, or revoke an issued permit under § 68-7 and use the posted bond to cover unremoved trash, debris or property damage.

Frequently Asked Questions

Does Harford County have a parade permit ordinance?
No. The county code contains no provision naming parades. The closest equivalent is Chapter 68's public-assembly permit, which by its terms governs concerts on private property drawing more than 2,000 spectators, administered by the Department of Inspections, Licenses and Permits.
How much does a Harford County concert permit cost?
Section 68-3 sets a $500 permit fee due when the application is filed, plus a cash bond of $1 per anticipated attendee with a minimum of $5,000, held by the county to cover any cleanup or property damage after the event.
How far in advance must I apply?
Section 68-4 requires the application at least 60 calendar days before the concert date. Late applicants can still be considered, but § 68-4(B) treats a late filer as having waived the right to notice and a hearing on the application.
Can the county deny my permit?
Yes. Section 68-6 lists specific grounds: inadequate parking or medical facilities, insufficient police protection, a performer's recent history of violence, a zoning violation, or excessive noise likely to disturb neighbors. The Director must decide within 60 days and give written reasons for any denial.

Sources & Official References

Other rules in Harford County

All Harford County rules

Compare Harford County to another location·View the Maryland special events & permits overview

Get notified when Parade Permits in Harford County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.