West Virginia Statewide Rule

West Virginia Solar Net Metering & Interconnection (§24-2F-8)

Some RestrictionsApplies statewide across West Virginia (2026)

Key Facts

Statute
W. Va. Code §24-2F-8
Enforcing agency
Public Service Commission
Aggregate cap
3% of utility peak demand
Residential reserve
0.5% of peak demand
Tech standard
IEEE + utility disconnect
Last verified: July 31, 2026

Summary

West Virginia has no statewide rooftop-solar permit, but W. Va. Code §24-2F-8 requires every electric utility to offer net metering to solar customer-generators and routes grid connection through Public Service Commission interconnection rules and a statewide capacity cap.

the total generation capacity installed by all customer-generators is no greater than three percent (3%) of the electric utility aggregate customer peak demand in the state during the previous year, of which no less than one-half percent (0.5%) is reserved for residential customer-generators

Full Breakdown

Under W. Va. Code §24-2F-8, every electric utility must offer net metering to customer-generators who install solar on the customer side of the meter, on a first-come, first-served basis by interconnection-application date. The Public Service Commission caps aggregate net-metered capacity at 3% of each utility's prior-year peak demand, reserving 0.5% for residential systems. Interconnected arrays must comply with IEEE standards and include a disconnect readily accessible to the utility between the customer-generator and the grid. The PSC sets the tariffs and interconnection rules; the utility enforces the disconnect and technical requirements. Building and electrical permits themselves are issued locally.

Violations & Penalties

A utility may deny interconnection or refuse to energize a solar array that fails IEEE standards or lacks the required utility-accessible disconnect. Once a utility's aggregate net-metering reaches the 3% cap, new customer-generators can be turned away until capacity frees up.

Frequently Asked Questions

Does West Virginia require a state permit for rooftop solar?
No statewide solar permit exists; building and electrical permits are issued locally. Grid-tied systems must still interconnect under W. Va. Code §24-2F-8, meeting IEEE standards and the Public Service Commission's tariff and disconnect rules.
Is net metering guaranteed in West Virginia?
Yes. Under §24-2F-8 electric utilities must offer net metering first-come, first-served, until aggregate customer-generator capacity reaches 3% of the utility's prior-year peak demand, with 0.5% reserved for residential customers.